Loading…
Loading…
906 results • Best match
Strengthening of road from NH -08 ( opposite to Tepania ECO Park) to BhuturmaTilla ( L 2.10 Km) and NH-08 ( near NSM College) to Sericulture office (L 3.30 Km) and Road from the house of ChayaChakraborty to the house of Saharabhanu ...
OR of NH 8 in between the Ch. 398.60 Km to Ch. 399.00 Km during the year 2019-20. SH Construction of RCC Retaining walls at Ch. 398.60 Km and 398.80 Km, landslide clearance, Hill side drain clearance, Stripping and filling of earthen etc.3r
Maintenance of road(NH-8 to hospital building and CMO office to morgue) at District Hospital Complex, Tepania during the year 2021-22
Mtc. of different roads i) NH 44 to Along Bari Via Sonaichari L 2.00 Km,ii)Dataram To Maidabari road under Matabari Block
Rehabilitation and up-gradation of road from km 0.000 to km 18.600 (Total length 18.600 km) of Kumarghat Kailashahar section on NH-208 to two lane with paved shoulder in the State of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from km 21.100 to km 29.200(Total length 8.100km) i.e. Kailashahar-Fultali section of NH-208(Package-I) in the state of Tripura on EPC basis
Mtc of road from NH 208 TO NH 208 via Kuleshnagar L 2 point 50 Km during the year 2023 24 SH Patch repairing WBM Soling Carpeting and Seal coat etc ch 000 km to 1 point 00 km
Improvement and widening to two lane with paved shoulder of road from Km 29.200 to Km 49.200 (Total length 20.000 km) i.e. Fultali - Jurichhara section of NH-208 (Package-II) in the state of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from Km 63.700 to Km 75.700 (Total length 12.000 km) i.e. Bamanchara - Srirampur section of NH-208 (Package-IV) in the state of Tripura on EPC basis
Improvement and widening to two lane with paved shoulder of road from Km 75.700 to Km 101.300 (Total length 25.600 km) i.e. Srirampur - Khowai section of NH-208 (Package-V) in the state of Tripura on EPC basis.
Improvement and widening to two lane with paved shoulder of road from Km 49.200 to Km 63.700 (Total length 14.500 km) i.e. Jurichhara - Bamanchara section of NH-208 (Package - III) in the state of Tripura on EPC basis
Improvement of road NH-208 (Rajkumar Para) to Rupaichari PWD office under Manu Constituency Assembly (3.20 km).
Mtc. of road from NH-44 (Old) to Srinibashpara (L - 1.15 Km) during the year 2023-24
Strengthening of road from NH-8 to Amtali via Twisama under RIDF XXVIII of NABARD (2nd Call)
Rehabilitation and up-gradation of road from km 0.000 to km 16.290 Total length 16.29 km of Manu Lalchara section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis Package-I
Rehabilitation and up-gradation of road from km 46.597 to km 66.845 (Total length 20.248 km) of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-III)
Rehabilitation and up-gradation of road from km 46.597 to km 66.845 Total length 20.248 km of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis-package-III
Mtc of different brick soled roads within Dalugaon area including construction of 01 No CD in the road from NH - 208 to NH - 208 via Ramkamal School during the year 2023-24 SH. Resoling, soling, shoulder repair, surface drain, C.D., etc.
Improvement of road including Drainage system from NH- 8 near Ramesh Chowmuhani to Jamtala (Near old Town Hall) via Jaganath Chowmuhani and east bank of Jagannath Dighi and from Badarmokam RCC/ Steel Bridge to Brahmabari (NH-8) via old Motorstand un
Periodical Repair of the road from NH 08 to NH 08 via back side of Kumarghat Sub Divisional Hospital L 600 00 mtr during the year 2023 24 SH Patch soling WBM 2 WBM 3 Carpeting and Seal Coating etc
Consultancy Services as Authoritys Engineer for Supervision of Improvement and Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder design Km 242.500 to Km 261.610 in the state of Tripura
Repair and Maintenance ofCHANDIPUR-KANCHANPUR Road of NH-44A, from Km 75.50 to Km 86.00 in the State of Tripura on percentage rate basis(2nd call).
Improvement and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) on Udaipur to Srimantapur section of newly declared NH-08 in the state of Tripura
IOAOD ENGG Development of NRO at LITCHU BAGAN TO MOHANPUR, BAZAR ON BOTH SIDE OF NH-8,Tripura.
Construction of Open Community Hall nh of Digendra Nath under Rajnagar GP Wno 3 at Jubarjnagar RD Block
FDR / Mtc. of road from NH-8 to TRTC Para road during the year 2022-23(4th Call)
Development of roads (i) NH-208 to West Lamboo (L 2.00Km) (ii) Old NEC road (L 1.80 Km).
Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 of Agartala Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis
Maintenance of road from A) Damdomiya to Lembucherra police station(Old NH 108B) and Fatikcherra to Mohinipur B) Old NH 108B to Kamalghat H.S. School during the year 2025-26/SH Patch grouting, WBM-III, carpeting, seal coat etc(L-13.00Km)/Gr-I
2. Improvement of different roads and drainage system under Udaipur Municipal Council area / Road from NH-8 to river bank road (Youth club to Charu Mia house via Rab ghazi shop), and NH-8 (beside Rubber board regional office) to Trijunction (KeshabR
Rehabilitation and up-gradation of road from design km 0.000 to km 11.800 (Total length 11.800 km) of Kailashahar Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC basis
Rehabilitation and up-gradation of road from design km 11.800 to km 25.250 Total length 13.450 km of Kailashahar Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-II
Rehabilitation and up-gradation of road from design km 11.800 to km 25.250 (Total length 13.450 km) of Kailashahar Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-II
Rehabilitation and up- gradation of road from design km 25.250 to km 36.460 (Total length 11.210 km) of Kailashahar Kurti Bridge section on NH 208 A to two lane with paved shoulder in the state of Tripura on EPC Mode-Package-III
CS for Preparation of DPR and providing pre- Construction services in respect of up-gradation to 2 4 6 lane from km 343 to km 456.5 on Churaibari to Agartala road section on NH-08 in the State of Tripura on EPC basis.
SELECTION OF CONSULTANTs/NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR Improvement and widening to 2 lane with paved shoulder from Km21.100 to Km101.30 Kailashahar - Khowai section of NH-208 in Tripura, with JICA loan assistance
Improvement of road from NH-08 to Mani Charan Para under Shakbari ADC Village under RIDF-XXVIII of NABARD
Maintenance of flood effected roads under PWD(NH) Baikhora Division, South Tripura during the year 2024-2025/ Gr-IV
FDR/Mtc. of road from NH-8 to Raipassa VC under Ambassa Sub-Division/ SH- Strengthening of SPT Bridge.
Maintenance of flood effected roads under PWD(NH) Baikhora Division, South Tripura during the year 2024-2025/ Gr-V
Construction of Open Community Hall nh of Niranta Tripura under Madhuban ADC Village Wno 2 at Jubarjnagar RD Block
Maintenance of flood effected roads under PWD(NH) Baikhora Division, South Tripura during the year 2024-2025/ Gr-III
Maintenance of flood effected roads under PWD(NH) Baikhora Division, South Tripura during the year 2024-2025/ Gr-II
Strengthening and widening for Railway Station road, Portion from Siddhi Aashram Chowmuhani to NH-08(44, By-Pass), Agartala
Improvement of road from NH 08 Rasham Bagan to Burning Ghat L 2.00 KM SH Metalling, BM and BC.
Maintenance of flood effected roads under PWD(NH) Baikhora Division, South Tripura during the year 2024-2025/ Gr-VI
Maintenance of flood effected roads under PWD(NH) Baikhora Division, South Tripura during the year 2024-2025/ Gr-I
Rehabilitation and up-gradation of road from km 16.077 to km 43.935 of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung road on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-II)
Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length 12.000 km) of Agartala Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis Contract
Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length 14.000 km) of Agartala Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-III)