| 1 | L1₹2.9 CrAdmitted-Finance 124 A NSC BOSE ROAD KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹1.2 Cr (40.7%)Admitted-Finance | ₹4.1 Cr+₹1.2 Cr (40.7%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non-responsive |
| Sl No | Description | Qty | Unit | C E Testing Company Pvt. Ltd. L1 | LnT Infrastructure Engineering Limited L2 |
|---|---|---|---|---|---|
| 1.00Schedule A (Fixed Lumpsum Cost) | |||||
| 1.01Remuneration for Local Staff (including per diem allowance) | |||||
| 1.02A. KEY PROFESSIONALS | |||||
| 1.03 | Team Leader Cum Senior Tunnel Engineer | 6 | Month | 1,41,600 ₹8,49,600 Lowest | 5,25,000 ₹31,50,000 |
| 1.04 | Senior Bridge Engineer | 4 | Month | 1,06,200 ₹4,24,800 Lowest | 4,75,000 ₹19,00,000 |
| 1.05 | Highway cum Pavement Engineer | 5 | Month | 94,400 ₹4,72,000 Lowest | 3,25,000 ₹16,25,000 |
| 1.06 | Material-cum-Geotechnical Engineer- Geologist | 6 | Month | 59,000 ₹3,54,000 Lowest | 4,75,000 ₹28,50,000 |
| 1.07B. OTHER PROFESSIONALS | |||||
| 1.08 | Senior Survey Engineer | 6 | Month | 41,300 ₹2,47,800 Lowest | 2,00,000 ₹12,00,000 |
| 1.09 | Traffic and Safety Expert | 4 | Month | 88,500 ₹3,54,000 Lowest | 4,75,000 ₹19,00,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
12 Jun 2023, 3:00 pmClosed
Prabodh Sharma
NHIDCL HQ, New Delhi
CS for Preparation of DPR and providing pre- Construction services in respect of up-gradation to 2 4 6 lane from km 343 to km 456.5 on Churaibari to Agartala road section on NH-08 in the State of Tripura on EPC basis.
2023_NHIDC_750083_1
NHIDCL/Tripura/NH-08 /DPR/C-A /2023
Open Tender
Civil Works
Item Rate
730 days
Tripura
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
24 Jul 2023
21 Apr 2023
13 Jun 2023
21 Apr 2023
12 Jun 2023
20 May 2023
21 Apr 2023 - 10 May 2023
11 May 2023
Amount
Schedule A (Fixed Lumpsum Cost)
Remuneration for Local Staff (including per diem allowance)
A. KEY PROFESSIONALS
Team Leader Cum Senior Tunnel Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
B. OTHER PROFESSIONALS
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed)
Bridge Engineer
Assistant Highway cum Pavement Engineer
Assitant Material cum Geotechnical Engineer
Survey Engineer
Assitant Quantity Surveyor/Documentation Expert
Support Staff (Fixed Rates)
Office Manager (1 No.)
Typist (1 No.)
Office Boy (1 No.)
Night Watchman (1 No.)
Transportation (Fixed costs)
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 6 months each) (Bolero or equivalent)
Duty Travel to Site (Fixed Costs)
All Trips
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
Office Furniture and Equipment (Fixed costs)
Office Furniture and Equipment
Reports and Document (Fixed costs)
Monthly Report (03 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed cost)
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc.
Schedule B (Item rate costs)
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Net work Survey and GPR
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of under ground utilities.
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200 m on either side of proposed Right of Way. Whereever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
Land Acquisition Team including support staff and logistics/transportation
A. Land acquisition Team including support staff
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoongo/ Girdawar or equivalent
Ex-Patwari or equivalent
Typist
B. Logistics for Land acquisition Team
Computer including necessary peripherals (2 No for 6 months each)
Printers (2 No for 6 months each)
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1 No for 6months)
LnT Infrastructure Engineering Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .