Loading…
Loading…
867 live706 closing this weekmost from Director Agriculture and Chief Engineer, PWD (R and B)
867 results • Latest
Jungle clearence,CrossDrainage,GSB,WBM-II,WBM-3, Carpeting, R.C.C Retaining wall, CD,R.C.C Drain, Road Marking etc Complete.
Development of road from Sonamura Boxanagar to Sonamura Boxanagar road (Dayalpara) (L-0.416 Km) SH Pucca Drain RCC Retaining Wall WBM 3 Paver Block and other allied works portion from Ch. 0.166 Km to Ch. 0.251 Km
Levelling Grading and Dressing of RK Nagar Land for Development of NFSU Tripura Campus by JCB
Construction of double cell RCC Box Culvert near the house of Baren Chakma at Karaicherra ADC village under Pecharthal R.D Block during the year 2026-2027 (2nd Call).
Internal Electrification for the work Construction of Health Sub Centre at Manuvalley GP, Golakpur VC, and Dhanbilash GP under Chandipur RD Block (2nd Call).
Construction of double cell RCC Box Culvert near the house of Mangal Debbarma at Golakpur ADC village under Chandipur R.D Block during the year 2026-27 (2nd Call).
Renovation of ST Boys hostel (Ground Floor) attached to Ledrai Dewan HS School, Pecharthal RD Block, Unakoti District under RD Kumarghat Division (2nd Call).
Road development work of road from KA Road to Lalchari Bridge Approach Road ( Length- 0.50 Km) and approach of kulai Dashamighat /SH- Metalling, Carpeting, Wearing coat of RCC Bridge etc.
Road development of road from KA Road to Bowliabasti (L-4.35 Km) / SH- Metalling, Carpeting, Pucca Drain, etc. Ch. 0.00 km to 1.00 km.
Const. Temporary Deprtmntal Exhibtn Stall, awearness through LED TV, Entry Gate size 50ft x 30ft alng NH-08, provdng fttng fixng flex at dffrnt locatn othr allied wrk complt Dewali Mela 2026 undr DWS SD No.-II, UDP, Gomati Tripura durng yr 2026-27.
Mtc of NRDWP/RWS/JJM Scheme located at Dhajanagar, Chataria, Daksin Bagma, Shalgarah, Garjanmura GP Under Tepania RD Block/SH- Extn pipeline,mtc of pipeline ,other allied works under DWS SDNO II during 2026-27(GR-I) (Deposit Fund).
Road development of road from NH-8 to Vivekanandanagar / SH- Metalling, Carpeting, RCC Cover Drain, etc. from Ch. 1.55 Km to 3.00 Km.
SH Patch Grouting Patch Soling Patch WBM 3 Carpeting with sand seal coat RCC Toe Wall CC Block pitching etc and other allied works
SH Grouting Patch WBM III Toe wall Carpeting with sand seal coat and allied works
Upgradation of road from Rajkandi Bazar to Sripur High School via Sadhurgaon from Ch 3 30 km 4 60 km under Rajkandi VC within the Jurisdiction of Ganganagar P W D R and B Sub Division Under Special Assistance to States for Capital Investment d
of Melaghar SubDivision PWD (RandB) during FY 2026 27 SH Patch WBM II and III Recarpeting and other allied works
FOOT BRIDGE
Development of Ambassa Colony Road (L-2.65 Km)/ SH- Grouting, WBM-III,Re-carpeting, RCC Retaining Wall, Pucca Drain etc.
SH Patch Grouting Patch Soling Patch WBM3 Carpeting with sand seal coat RCC Toe Wall CC Block pitching etc and other allied works
Road development of road from NH-8 to Vivekanandanagar / SH- Metalling, Carpeting, RCC Cover Drain, etc. from Ch. 0.00 Km to 1.45 Km.
Development of Roads from i) KMA road to Bagmara road (L-1.20 km). ii) NH-8 to Hadukalak Para ( L-1.00 Km). iii) Kulai HS School Approach road ( L-0.30 Km), (Total Length -2.50 Km)/ SH- Grouting, WBM-III, Re-carpeting, Pucca Drain etc.
Procurement of supply of Equipment and Instrument under SASCI Project for the use Anatomy Department, AGMC and GBPH, Agartala
Development of different roads under Masauli GP West Kanchanbari GP East Ratacherra GP Rajnagar GP Fatikcherra VC within the Jurisdiction of Ganganagar P W D R and B Sub Division Under Special Assistance to States for Capital Investment during
SH Grouting Patch WBM III Carpeting with sand seal coat placing PVC wire crates and other allied works
Supply of interlocking Paver block of different sizes for different construction work against various scheme within Matabari,Kakraba n,Killa,Tepania R.D Block under Udaipur R.D Division.
Construction of Ramp and Handrail in 5 (Five) nos. School under Matabari, Tepania and Karbook Block of Gomati District under Samagra Shiksha during the year 2025-26/3rd Call.
SH Grouting Patch WBM III Carpeting with sand seal coat and allied works
Major repairing of Bamnimura SB School under Nalchar Block, Sepahijala District during the year 2026-27/2nd call.
WSS undr JJM/SH- Qlty imp of drinkng water supply by way of cons 04Nos. of 5000 GPH, 04 Nos. of 7500 GPH cap package type IRP in/c allied works etc. complt in all respect at Matabari R.D. Block underDWS SD No-II, UDP Gomati, Tripura 2024-25 (Gr-I).
Upgradation of road from Rajkandi Bazar to Sripur High School via Sadhurgaon from Ch 2 30 km 3 30 km under Rajkandi VC within the Jurisdiction of Ganganagar P W D R and B Sub Division Under Special Assistance to States for Capital Investment d
Construction of RCC Foot bridge (Small Bridge for movement of four wheeler and pedestrian along with bothside approach road) at Subharam Chowdhury Para under Sreeramkhara ADC Village under Mungiakami RD Block, Khowai District (as per PWD SoR 2023).
Upgradation of road from Rajkandi Bazar to Sripur High School via Sadhurgaon from Ch 1 00 km 2 30 km under Rajkandi VC within the Jurisdiction of Ganganagar P W D R and B Sub Division Under Special Assistance to States for Capital Investment du
Construction of 70.0 M Paver Block Road, 80.0 M Pucca Drain and 25.0 M Toe Wall from 43 Miles NH8 road to Biladhan High School at Atharamura VC under Mungiakami RD Block, Khowai District, Tripura during FY 2026-27(as per PWD SoR 2023).
Renovation of damaged drill shed at 7th Bn TSR HQr Sangkumabari Jampuijala HQr. Sangkumabari, Jampuijala
SH-WBM-III, Prime Coat, Tack Coat, Carpeting,Re-Carpeting, Seal Coat and Paver Block etc.
WBM3, BPM, PMC, Seal coat etc. from Ch. 6.50 km to 8.00 km./(2nd call)
SH-WBM-III, Repairs of potholes, Re carpeting etc.
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Karamjoy para under Dhalai Tripura
Mtc and Repairing of electrical accessories and other allied works at different existing DTW Schemes at Rupaichari Sector under Rupaichari Block within the jurisdiction of DWS SubDivision, Rupaichari during the year 2026-2027. 2nd call
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at SK Para under Dhalai Tripura
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Madhav Master para under Dhalai Tripura
Hiring of commercial vehicle Wagon RMaruti CelerioX not earlier than 2025 model for the use of Office of the Assistant Engineer, PWD DWS SubDivision Rupaichari, Sabroom, South Tripura for the peroid of 01 One year.
Maintenance and repairing of existing SBDTW Schemes at different locations of Baishnabpur Sector under Rupaichari Block area
Flood Damage Repair FDR Protection of Kamalapur Village Near L I Scheme from erosion of right side bank of Deo River under Pecharthal ADC village of Pecharthal RD block under WR Sub Division Kanchanpur North Tripura during the year 2026 2027 S
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Panitilla under Panisagar North Tripura.
Flood Protection of Baithangbari playground and household from the erosion of Raghnacherra Balidhum ADC village under Jubarajnagar R D block Job No TR 09 Special Assistance for Capital Investment 2025 26 SH Bank revetment work by Cement Con
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Nalkata (near Bridge) under Dhalai Tripura
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Uttar Unakoti under Unkoti Tripura
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Upanagar (near Reang Coloney) under Dhalai Tripura
NH Site Market Shed for Jumious and Organic Growers SH Construction of market Shed at Nailahapara under Dhalai Tripura