Loading…
Loading…
26 live16 closing this weekmost from Chairman cum MD, TSECL and Power Department Tripura
26 results • Latest
Providing 78 Seventy Eight nos casual labour for revenue management Service connection Operation and maintenance of HT LT line Sub Station etc to be engaged under ESD Mohanpur ESD Bamutia ESD Hezamara ESD Lefunga within jurisdiction of ED Mohanpur
Extension of 11KV XLPE U.G Cable 3 Core,120 Sqmm and Installation of 1000 KVAX3 no DT (one no Spare Txr) for providing of double feeding power supply system at newly construction of G 14 Building at High Court Complex, Agartala under ESD-CC
Extension of HT/LT line including installation of 25KVA Ditribution Sub-Station for providing electyricity connection to 4G BSNL under ESD-GNT
Extension of HT line including installation of 63 KVA Distribution Transformer at SVO3 station Panisagar Agartala pipeline of M/S Indradhanush Gas Grid India at Gangacharra Mouza of Longtarai valley under ESD-Ambassa.
Replacement of Old 11 KV Indoor VCB Panels with new 11KV Indoor VCB Panels at Dasda 33/11KV Sub-Station under Electrical Sub-Division, Dasda under the jurisdiction of ED-Kanchanpur TSECL
Creation of infrastructure and Installation of 11/0.43 KV, 3X1000 KVA Distribution Transformer for system strengthening of three phase power supply system at the High Court of Tripura, Agartala
Construction of HT LT line from Ramthakur Mandir to Bankumari and shifting of Existing HT LT line for road widening under ESD Ambassa
Collection of revenue/outstanding electricity bills from the Private Active consumers of Electrical Sub-Division- Jirania, Khumulwng and Mandwi under ED-Jirania of TSECL for 12(twelve) months through outsourcing.
Collection of Outstanding Electricity Bill from defaulting Consumers of various ESDs under ED-Udaipur of TSECL for 12 (twelve) months through outsourcing.
As per Bid Document
As Per Bid Document
As per Bid Document
As per Bid Document
Supply,erection and commissioning of 11 KV VCB panels for replacement of old VCB 11 KV for GNR SS under ESD AMB
Collection of outstanding revenue through E Wallet recharge method by engagement of outsource agency under ESD-Kathalia for 12 months initialy, extendable up to 6 more months subject to satisfactory performance
Collection of outstanding revenue through E Wallet recharge method by engagement of outsource agency under ESD Melaghar and Nalchar for 12 months initialy extendable up to 6 months subject to satisfactory performance
Collection of outstanding revenue through E Wallet recharge method by engagement of outsource agency under ESD-Sonamura for 12 months initialy, extendable up to 6 months subject to satisfactory performance
Collection of outstanding revenue through E Wallet recharge method by engagement of outsource agency under ESD-Boxanagar for 12 months initialy, extendable up to 6 months subject to satisfactory performance
Appointment of Independent Verification Agency for Verification of Disbursement Linked Indicators (DLIs)under Transforming Renewable Energy Acceleration in Tripura Program financed by Asian Development Bank through Result Based Lending modality
Distribution Transformer, 3 Phase, 11 kV, >200 KVA upto and Including 2500 KVA ISI Marked To IS 1180 (Part 1) (Q2) (3 (3 ))
Setting up of Smart Centralized Customer Care Centre System on SaaS (System as a Service) basis
Engagement of Manpower and vehicles under Capital Complex Electrical Division , EC-I ,TSECL PACKAGE C
Engagement of Manpower and vehicles under Electrical Division II , EC-I ,TSECL PACKAGE B
Engagement of Manpower and vehicles under Electrical Division I , EC-I ,TSECL PACKAGE A