Loading
Loading…
Loading…
8 results • Latest
Arresting leakages by grouting, shotcreting, pointing etc., and construction of lug walls to the Type-III Aqueduct at Km 119.300 and IP side at Km 120.950 of RBLLC.
Arresting the leakages for abutments and wing walls and rising of guide walls of UT @ Km 84.811 of RBLLC
Strengthening of the Spillway piers 01 to 15 of TB Dam.
Improvements to Super passage at Km 26.658 of RBHLC.
Providing CC Bed lining from Km 45.200 to Km 45.400 & Raising of existing CC wall upto Free board from Km 53.700 to Km 53.900 of RBHLC
Repair to spillway road bridge and approach roads of TB Dam.