Loading…
Loading…
140 results • Latest
Improvements to One side Protection wall at Km 8.750 of RBLLC
Construction of new hard passage at Km 99.900 of RBLLC
Providing 2 Nos. of foot bridges in Chintakunta Section of RBLLC
Providing New Howrah bridges 3 Nos. at Km 187.000, Km 193.900 and Km 203.100 of RBLLC
Supply of 35 HP Mody Pumps ( Model G 902 T ) along with control panel pertaining to Mechanical Section of Dam Power House
Reconstruction of siphone Bridge (to Cross BWS waste water) near Allipur at Km 82.900 of RBHLC.
Improvements to Allipura colony and repairs to existing quarters at Km 83.000 of RBHLC
Providing and constructing dry stone pitching and toe drain to embankment reach from Km 43.200 to Km 44.000 L/S of RBHLC.
Strengthening to downstream divide walls of TB Dam.
Underwater pointing to upstream face of TB Dam