Loading
Loading…
Loading…
99 results • Recent activity
Strengthening of Canal banks by providing additional berms in between Km 57.950 to Km 58.150 and Km 59.350 to Km 59.550 of RBHLC.
Strengthening to downstream divide walls of TB Dam.
Providing CC Bed lining from Km 45.200 to Km 45.400 & Raising of existing CC wall upto Free board from Km 53.700 to Km 53.900 of RBHLC
Underwater pointing to upstream face of TB Dam
Construction of protection wall & wing wall to UTs at Km 33.120 and Km 37.440 of RBHLC
Construction of new Ramp at Km 72.050 of RBHLC