Loading…
Loading…
112 results • Latest
Supply and Delivery of 4 Sq 3 Core copper cable wire and Drivers, PCBs and clamp sets, GI pipes and cable for the street light maintenance in the limits of Pulivendula Municipality
FDR - Restoration of Sluice and Bund of Kannavaram Big tank near Kannavaram village in Satyavedu Mandal of Tirupati Distirct
Repairs to existing old building painting work and other repair works in Pulivendula Municipality
Construction of RCC Roof Additional Block in Government College for Women at Guntur Urban in Guntur District
Construction of CC Road and Drain wall raising to Eluri vari street in 19th ward in Tanuku Municipality
Construction of Rooms in Second Floor over the existing electrical panel room building at back side of Hari Sadan Rest House for use of Canteen Staff near SPRH at Tirumala.
Providing of Housekeeping services to Corporate Training Institute, APSPDCL, Tirupati for the period from 01-05-2026 to 31-03-2027
Additional Works Artificial Grass, Pergola Roof Sheets, Painting Work and Electrical Works in Rajiv Park and Bhagath Singh Park in Kadapa Municipal Corporation
Improvements to the road Bitragunta-Brahmanakraka road from km 6/0 to 12/800 in Nellore District
Selection of Successful Bidder for Excavation and Loading of Sand into consumers vehicles by semi mechanized method for Royyuru-2 Sand Reach situated in the Sy.No. 270/2, 314 of Royyuru Village, Thotlavalluru Mandal, Krishna District, Andhra Pradesh.
Providing Semi Skilled workers in between Km.72/000 to Km.105/435 of RBHLC in HLC No.2 Sub Division, Toranagallu for the year 2026-27 i.e., from May-2026 to February 2027 (10 Months).
Providing Semi Skilled workers in between Km.40/000 to Km.72/000 of RBHLC in HLC No.2 Sub Division, Toranagallu for the year 2026-27 i.e., from May-2026 to February 2027 (10 Months).
Providing Semi skilled workers in LLC and HES Colonies in LLC NO.3 Sub Division Ballari for the period from May-2026 to February 2027.
Providing Semi Skilled workers in between Km.70/000 to Km.135/000 of RBLLC in LLC No.2 Sub Division, Ballari for the year 2026-27 i.e., from May-2026 to February 2027
Providing Semi Skilled workers in between Km.135/000 to Km.184/000 of RBLLC in LLC No.3 Sub Division, Ballari for the year 2026-27 i.e., from May-2026 to February 2027
Providing Semi Skilled workers for colonies and Estate Sub-Division (T-2 section) of TB Board, TB Dam for the period from 01.05.2026 to 28.02.2027
Providing Semi Skilled workers in between Km.0/000 to Km.40/000 of RBHLC in HLC No.1 Sub Division, TB Dam for the year 2026-27 i.e., from May-2026 to February 2027
Providing Semi Skilled workers in between Km.184/000 to Km.250/580 of RBLLC in LLC No.4 Sub Division, Adoni for the year 2026-27 i.e., from May-2026 to February 2027
Providing Semi Skilled Workers for Offices & Colonies of TB Dam for the period from 01.05.2026 to 28.02.2027
Providing Semi Skilled workers in between Km.0/000 to Km.70/000 of RBLLC in LLC No.1 Sub Division, Kurugodu for the year 2026-27 i.e., from May-2026 to February 2027
Procurement of Workstations to CCTV Sub -Control Section -III Tirumala Vigilance and Security department Communication wing at Sri TT Parakamani Tirumala and Chief Engineeer Officer of TTD, Tirupati
Improvements to the road Makkapeta Gandrai road from Km 5 000 to 8 350 in NTR District 2nd call
Providing Flooring, Plastering, Painting, Electrification, Door, Windows and Construction of Toilet Yalamavaridinne Ward Secretariat Building in Division No. 13 in Nellore Municipal Corporation.
Improvements to Old Division office in LLC Colony,Ballari.
Improvements to Cross Regulator at Km 250.580 of RBLLC
Construction of new Bridge at Km 124.200 at G Nagenahalli village of RBLLC.
Raising of bunds and lug walls to raise free board from Km 3.500 to Km 5.400 and Km 16.000 to Km 17.000 of Power Canal
Providing CC Lining from Km 0.000 to Km 3.000 in DP-73 of RBLLC
Raising of Protection Walls to RBC FIC Siphon Points at Km 2.363, 2.954, 3.046, 3.261, 3.444, 3.589, 3.680, 3.698 and 4.826 of Power Canal.
Providing CC Lining from Km 188.025 to Km 188.325 of RBLLC
Providing CC Lining from Km.187.300 to Km.187.500 of RBLLC
Restoration of Canal Section and providing CC Lining from Km 180.000 to Km 180.200 of RBLLC
Providing GI sheet & Transparent sheet cladding for BCN 102A & BCN 102B Galleries of Crusher House @ EL 44 meters, BCN 1A & BCN 1B Galleries of JNT-1 @ EL 20 meters, BCN 2A & BCN 2B Galleries of JNT-3 @ EL 14 meters and Galleries of JNT-5,6&7 (only Transparent sheet cladding) @ EL 60 meters.
Hiring of mobile toilets for Annual Brahmostvams at SNVS Temple Jammalamadugu, Kadapa District for the year 2026.
Laying of CC Road from rehaman beg house (d.no: 5/113-5) to bajeed beg house (d.no: 5/122-5) in ward no.5 of pedana municipality under 15th fc 2024-25 (1st instaLlment) untied grant.
Improvements to Bhimavaram to Gudiwada road (SH019) from Km 1.950 to 3.400 in West Godavari District
Improvements to outlet at Km. 3/078 of RBLLC and Construction of Protection wall at D/s of GK Escape.
Improvements to HES quarters at HES colony, Ballari.
Arresting the leakages for abutments and wing walls and raising of guide wall to UT at Km 134.100 and KM 134.290 of RBLLC
Construction of steel bridge Near Km 32.050 and Km 38.100 of RBLLC
Arresting leakages and improvements to Narehalla aqueduct at Km 27.600 of RBLLC
Providing of 2 Nos. of Foot Bridges and Improvements to existing foot Bridges in Bapuram Section of RBLLC
Improvements to One side Protection wall at Km 8.750 of RBLLC
Construction of new hard passage at Km 99.900 of RBLLC
Providing 2 Nos. of foot bridges in Chintakunta Section of RBLLC
Providing New Howrah bridges 3 Nos. at Km 187.000, Km 193.900 and Km 203.100 of RBLLC
Supply of 35 HP Mody Pumps ( Model G 902 T ) along with control panel pertaining to Mechanical Section of Dam Power House
Reconstruction of siphone Bridge (to Cross BWS waste water) near Allipur at Km 82.900 of RBHLC.
Improvements to Allipura colony and repairs to existing quarters at Km 83.000 of RBHLC
Providing and constructing dry stone pitching and toe drain to embankment reach from Km 43.200 to Km 44.000 L/S of RBHLC.