Loading…
Loading…
16 results • Latest
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Amroha with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Budaun with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
RFP for Selection of Internal Auditor for UPEIDA for the FY 2026-27
Collection of User Fees and Operation of Toll Plazas along with deployment of 12 number of Patrol-cum-Safety Vehicles along with required personnel manning these vehicles along Bundelkhand Expressway
RFP for Development of four Way Side Amenities along Bundelkhand Expressway BE-1 Banda RHS, BE-2 Hamirpur RHS, BE-3 Jalaun RHS, BE-4 Jalaun LHS with Concurrent Period of Five (05) Years for DLP and O and M on EPC mode.
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Sultanpur with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Amethi with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
Innova Crysta Accessories
Mobile Storage Compactors (Q3)
RCC Boundary Stone in IMLC at Village Saray Katiyan Tahsil Sadar District Unnao Uttar Pradesh