Loading…
Loading…
13 live6 closing this weekmost from U.P. Expressways Industrial Development Authority
13 results • Latest
Development of Integrated Manufacturing and Logistics Clusters at Raebareli with Concurrent Period of Five Years for Defect Liability Period and Operation and Maintenance on EPC Mode
Development of Integrated Manufacturing and Logistics Clusters at Ambedkar Nagar Gorakhpur Link Expressway with Concurrent Period of Five Years for Defect Liability Period and Operation and Maintenance on EPC Mode
Development of Integrated Manufacturing and Logistics Clusters at Pratapgarh with Concurrent Period of Five Years for Defect Liability Period and Operation and Maintenance on EPC Mode
Development of Integrated Manufacturing and Logistics Clusters at Chitrakoot with Concurrent Period of Five Years for Defect Liability Period and Operation and Maintenance on EPC Mode
Development of Uttar Pradesh Defence Industrial Corridor at Chitrakoot with Concurrent Period of Five Years for Defect Liability Period and Operation and Maintenance on EPC Mode
Consultancy Services for Authority Engineer for Supervision of Development of Greenfield Access Controlled Agra Lucknow Expressway to Purvanchal Expressway Link Expressway 6 Lane Expandable to 8 Lane Project in the state of Uttar Pradesh on EPC
Consultancy Services for Authority Engineer for Supervision of Development of Greenfield Access Controlled Jhansi Link Expressway 6 Lane Expandable to 8 Lane Project in the state of Uttar Pradesh on EPC Mode
Consultancy Services for Authority Engineer for Supervision of Development of Greenfield Access Controlled Jewar Airport To Ganga Expressway via Bulandshahar Link Expressway 6 Lane Expandable to 8 Lane Project on EPC Mode.
Consultancy Services for Authority Engineer for Supervision of Development of Greenfield Access Controlled Agra Lucknow Expressway to Ganga Expressway Via Farrukhabad Link Expressway 6 Lane Expandable to 8 Lane Project on EPC Mode
Selection of an Agency for Operation and Maintenance of Food Kiosk at Package VIII of Purvanchal Expressway at chainage 315.900 Km LHS
PROVIDING, INSTALLATION, ARRANGEMENT OF GERMAN HANGER, BARRICADING, STAGE, SWISS COTTAGE, LIGHTING, SOUND SYSTEM, LED DISPLAY AND OTHER MISCELLANEOUS WORKS FOR THE FOUNDATION STONE LAYING-INAUGURATION OF NEW EXPRESSWAYS AND OTHER PROJECTS
Selection of a Consultant to provide Consultancy Services for Upgradation, Standardisation and Monitoring of Way-side Public Sanitation (WASH) facilities on UPEIDA Expressways.
DEVELOPING, OPERATING AND MAINTAINING OF ADDITIONAL WAYSIDE AMENITIES ON AGRA-LUCKNOW EXPRESSWAY ON LEASE BASIS.