Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
152 live145 closing this weekmost from U P Irrigation Department (Civil)
152 results • Latest
Kanhar Irrigation Project HDPE Pipeline Works Supply, Laying, Jointing, Hydro testing and commissioning of HDPE pipelines for 08 Nos Minor canals in Duddhi and Obra Tehsil, Sonbhadra district
07/EE/26-27 Leying stone Boulder pitching at u/s of P.R.B. at km. 0.225 of L.K.C
07/EE/26-27 EARTH WORK FROM KM 4.250 TO KM 4.300, KM 4.575 TO KM 4.850 AND CONSTRUCTION OF VRB CUM FALL AT KM. 4.735 OF BOME MINOR
07/EE/26-27 Earth work for Construction of Jorukhad Minor Between Km. 1.600 to Km 1.730
Silt Clearance/ Scrapping of Dariyapur Minor from Km 0.000 to Km 10.000
Silt Clearance/ Scrapping of Dhanapur Dy. from Km 0.000 to Km 11.816
Silt Clearance/ Scrapping of Kolpur Dy.from Km 0.000 to Km 11.350
Auction of Silt in bed from Km 20.600 to 47.200 of Deoria Dy
Auction of Silt in bed from Km 32.600 to 36.800 of Hata Dy.
Auction of Silt in bed from Km 38.400 to 40.400 of Hata Dy
Auction of Silt in bed from Km 42.400 to 43.700 of Hata Dy
Auction of Silt in bed from Km 0.000 to 7.400 of Baikunthpur mr.
Auction of Silt in bed from Km 0.000 to 7.800 of Dhanauti Minor
Auction of Silt in bed from Km 0.000 to 3.000 of BALIYAWA MINOR
Auction of Silt in bed from Km 14.000 to 24.000 of Baitalpur Dy
Auction of Silt in bed from Km 0.000 to 9.200 of PARSA DY.
Construction of Tunnel From Km. 3.875 to 4.500 and Earthwork for making Canal Section from Km 3.635 to Km 3.875 and Km 4.500 to Km 4.700 of Gajarawakhadi Dy.
Repair work on the embankment road (from km 12.300 to km 13.050 of the HMB section) between NH-09 and the Chhajarsi roundabout in Gautam Buddh Nagar district.
Silt clearance/Scrapping Work of Canal section of Bisahupur Minor from Km. 0.000 to Km. 16.000 )
02- RAJWAHA KHANDRAWALI KE KM 19.400 SE KM 19.900 TAK ROAD KE NAVINIKARAN KA KARYA.
01- RAJWAHA MASAVI KE KM 0.000 SE KM 1.600 TAK BITUMIN ROAD KE NAVINIKARAN KA KARYA.
Silt clearance of Belwa Minor From 0.000 to 2.690 AndSilt clearance of Sihuliya Minor From 0.000 to 1.200
Silt clearance of Belwa Baitalpur Minor Between Km. 0.000 to 2.800
Silt clearance of Champapur Minor Between Km. 0.000 to 2.200
Silt clerance of Bishunpur mr. Between Km. 0.000 to 2.000
Silt clearance of Bhagwanpur mr. Between Km. 0.000 to 3.000 and Silt clearance of Karjaha mr. Between Km. 0.000 to 2.200
Silt clearance and Scraping of Paharpur mr. Between Km. 0.000 to 2.980
Silt clearance of Khairatawa mr. between Km. 0.000 to 1.300
Silt clearance of Shampur mr. between Km. 0.000 to 4.200
Silt clearance of Dubauli mr. between Km. 0.000 to 3.800 including tailgul
Semara mr. between Km. 0.000 to 3.600 and Silt clearance of Manjhariya mr. between Km. 0.000 to 0.850
Silt clearance of Hetimpur mr. between Km. 0.000 to 4.000
Silt clearance of Mundera mr. between Km. 0.000 to 5.600
Silt clearance of Katra Minor (km.0.00-3.600) Mohanpur Minor (km.0.00-4.00) and Lakuri Minor (km.0.00-3.400)
Project for the construction of the Parapet Wall and Bitumen Road of Kachnauda Dam
Construction of Gul Crossing at km. 7.950 and Tail wall of Faridpur Dy for the year 2026-27(Lot-02)
Project for the construction of the Parapet Wall and Bitumen Road of Lower Rohini Dam
Special repair of Kulaba of Bhanera Mr. for the year 2026-27(Lot-03)
Special Repair of Restoration of Faridpur Dy. From km. 7.995 to km. 8.150, Km. 8.240 to 8.495 and Km. 8.600 to km. 8.750 for the year 2026-27(Lot-01)
CONSTRUCTION OF R C C PILLAR FOR FIXATION OF FLOOD PLANE ZONE ON BOTH BANK OF RIVER SHARDA IN DISTRICT PILIBHIT AND LAKHIMPUR KHERI
Silt clearance of Kamlapur Dy From Km. 0.000 to Km 7.950 (Lot-39)
Construction of 900 mm Dia. DI (K-7) Pipe Canal, Including Earth work, Concrete Works, Pipe Supply, Laying, Jointing, Fixing and Hydraulic Testing in Gajarawa Khadi Dy. from Km 0.000 to Km 1.850.
Providing launching apron with top layer in wire crates (2.5x1.5x1.0M) using stone boulder from 25-60 kg in front of gate no.-3 to 4 in down stream of Adwa Barrage Site.
SILT CLEARANCE/SCRAPPING WORK OF NEOTINI DY. FROM KM 0.00 TO KM 15.600
SILT CLEARANCE OF KUREBHAR DY FROM KM 24.100 TO KM 30.000 AND SCRAPING FROM KM 30.000 TO KM 38.200
Construction of DINGARPUR DY from km 22.200 to km 22.310 under Project M.G.C. Stage-II
Silt Clearance Of Bhaggupur Mr From Km 0.000 To Km 10.000 And Scrapping From Km 10.000 To Km 13.400
Road renewal work on the lefte bank and connecting approach roads of the Bahjoi Branch from km 1.010 to km 2.330
SCRAPED SILT FROM KM 21.063 TO KM 22.516 RIGHT BANK ON BARABANKI BRANCH