Loading…
Loading…
523 results • Recent activity
construction of CC lining Reach From 2.896 Kulaba no 17 to 3.171 Km Kulaba No 19 275.00 mtr total in main canal at Gurha pump canal block naraini distt banda
construction of CC lining Reach From3.441 to 3.606 Km 165.00 mtr total in main canal and syphon no 06 Both side 50 mtr total 100 mtr at Gurha pump canal block naraini distt banda
CONSTRUCTION OF 04 Nos JUNIOR ENGINEER RESIDENCE Type III G Plus 1 AT TUBEWELL COLONY CAMPUS JALAUN of District JalaunU.P.
Supply and carriage of pea gravel of size 2.00 to 3.35 mm (IS Code-4097-1967 Reaffirmed Latest) from Lalkuan Haldwani to Central store Prayagraj Dist-Prayagraj including screening, loading, unloading, stacking, Royality, Contractor profit, all taxes
PROVIDING LAYING AND JOINTING OF AC PRESSURE PIPE BY MAZZA PROCESS OF 500 MM DIA CLASS 20 AS PER IS CODE 1592 2003 AND IS CODE 6530 1972 HAVING LENGTH 3.40 KM.FOR RAMPUR MINOR WITH ALL FITTINGS AND OUTLETS AS PER DRAWING ENCLOSED ON TURN KEY BASIS IN
BRICK LINING AT PUMP CANAL