Carpeting of Roads by Paver Finisher in scheme area of EE-III, UIT, Alwar.
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3
Carpeting of road by Paver Finisher in Non Scheme area of EE-II and III, UIT Alwar. (Annual Contract 2025-26)
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3
Road patch repair work of area of EE-II and III, UIT Alwar. (Annual Contract 2025-26)
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2
Construction of CC road in area of EE-III, Alwar. (Annual Contract 2025-26)
Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed : All kinds of soil
Design of Sewer Network in Aravali Vihar 1 and 2 and Ambedkar Nagar Block M and N and Construction of Nallah , Alwar, Rajasthan