Loading…
Loading…
Found 5 active tenders
5 results • Latest
E-NIT-48-III-2025-26-WORK NO 02
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks
E-NIT-48-III-2025-26-WORK NO 03
Earth work in excavation in open area, STP, WTP, Pumping station with mechanical means including dressing of sides and ramming of bottoms, including getting out the excavated material, disposal of excavated material lead upto 1000m at suitable site as per as per drawing and as per direction of Engineer. (Measurements for payment to be done as per standard drawings).Above 3.0 m and upto 6.0 m depth
E-NIT-49-III-2025-26 WORK NO 01 Construction of SPS Near Meghwal Basti Nokha Road and Rising Main up to Open Bhumi with 5 years O AND M Bikaner
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead up to 50m
E-NIT-48-III-2025-26-WORK NO 03
Earth work in excavation in open area, STP, WTP, Pumping station with mechanical means including dressing of sides and ramming of bottoms, including getting out the excavated material, disposal of excavated material lead upto 1000m at suitable site as per as per drawing and as per direction of Engineer. (Measurements for payment to be done as per standard drawings).Above 3.0 m and upto 6.0 m depth
E-NIT-48-III-2025-26-WORK NO 01
Dismantling of existing structures like culverts, bridges, retaining walls, and other structures comprising of masonry, cement concrete, woodwork, steelwork; including T&P (Tools and Plants) and scaffolding wherever necessary. The work includes sorting the dismantled material, disposal of unserviceable material, and stacking the serviceable material with all lifts and lead up to 1000 m, as per MoRTH Specification Clause 202.Cement Concrete