Loading…
Loading…
93 results • Latest
Erection of 3.3KV overhead line for feeding power to dewatering pump to be installed in new proposed sump at Makardhokda-III OCM of Makardhokda Sub Area.
Hiring of 01 no. 54 seater diesel driven bus for transportation of employees of WCL from WCL Umrer/MKD colonies to Gokul OCM of UA for 24 hrs and avg. running 333 Km/day with 02 drivers and 02 conductors for 02 years (365 days/year basis)fuel 5km/lit
Hiring of 02 nos. Mahindra Bolero/TUV/ Tata Sumo (Non AC) or equivalent light diesel driven vehicle for the MKD Sub Area and Gokul OCM of UA on 24 hrs and avg. running 100 Km basis/day with 03 drivers for 02 years (341 days/year basis), fuel 10km/lit
WORK OF ERECTION OF ALTERNATE 1.5 KM, 3.3 KV OH LINE FOR FEEDING POWER TO DE- WATERING PUMPS TO BE INSTALLED IN NEW SUMP AT GOKUL OCM.
Cleaning of coal/ coal dust/ mud etc from CHP belt conveyors/ walkways/ gantries/ feeder breaker/ R-feeder/ crusher/ structures/ foundation and tail end required on day to day basis for one year in all the 3 plants (IR, Elecon, L and T) at Umrer OCM.
Carrying out structure Stability test and NDT test of 03 nos. of Coal Handling Plant (CHP) and their structure at Umrer OCM.
ENGAGEMENT OF AIR COOLERS SIZE -4 INCH-152 NO. FOR AGM OFC AND OTHER OFC OF AREA UNIT ON CONTRACTUAL BASIS FOR PERIOD OF 03 MONTHS FROM APRIL 2022.
Installation of Franklin Rods for protection against lighting at various places of Gokul OCM.
Repairing/ Teeth Building of 04 Nos. Crusher Roll of 80 inch L and T Crusher of Umrer CHP.
Engagement of Air Coolers size 4 inch 142 Nos. for AGM Office and other offices of area unit on contractual basis for a period of 03 (three) months from April, 2021 onwards.