Loading…
Loading…
93 results • Recent activity
Erection of 3.3KV overhead line for feeding power to dewatering pump to be installed in new proposed sump at Makardhokda-III OCM of Makardhokda Sub Area.
Hiring of 01 no. 54 seater diesel driven bus for transportation of employees of WCL from WCL Umrer/MKD colonies to Gokul OCM of UA for 24 hrs and avg. running 333 Km/day with 02 drivers and 02 conductors for 02 years (365 days/year basis)fuel 5km/lit
Hiring of 02 nos. Mahindra Bolero/TUV/ Tata Sumo (Non AC) or equivalent light diesel driven vehicle for the MKD Sub Area and Gokul OCM of UA on 24 hrs and avg. running 100 Km basis/day with 03 drivers for 02 years (341 days/year basis), fuel 10km/lit
WORK OF ERECTION OF ALTERNATE 1.5 KM, 3.3 KV OH LINE FOR FEEDING POWER TO DE- WATERING PUMPS TO BE INSTALLED IN NEW SUMP AT GOKUL OCM.
Cleaning of coal/ coal dust/ mud etc from CHP belt conveyors/ walkways/ gantries/ feeder breaker/ R-feeder/ crusher/ structures/ foundation and tail end required on day to day basis for one year in all the 3 plants (IR, Elecon, L and T) at Umrer OCM.
Carrying out structure Stability test and NDT test of 03 nos. of Coal Handling Plant (CHP) and their structure at Umrer OCM.