Loading…
Loading…
87 results • Latest
Sub Head Construction of Civil work providing, laying ,jointing and testing of Rising main supply and errection of centrifugal pumping machinery along-with its all allied accessories complete etc.
SH Providing and fixing of Dozer pump controller device to the chemical dosing pump in various WSS ) Job-2.
( SH Providing and fixing of Dozer pump controller device to the chemical dosing pump in various WSS ) Job-1.
C/O Delivery tank and out let (20088)
Construction of overhead storage tank of 50,000 ltrs with 10.00 mtrs staging height
Dismentalling of water pipe line 570 mtr. of 65 mm dia and 80 mm dia and Relaying the same.) PDNA (20406)
C/O water tank 40000 ltrs. capacity (20090)
C/O storage tank of 45000 ltrs. capacity (20027)
Repair and flushing of hand pumps at various location section Bangana
Repair and maintenance various hand pumps points