Loading…
Loading…
Found 7 active tenders
7 results • Latest
Survey, Investigation and execution for Shifting of Storm Drainage Line near Manduadih Crossing in Varanasi City, U.P. under Deposit Program
Utility Management
Survey, Investigation and execution for Shifting of Storm Drainage Line near Bhikharipur T point in Varanasi City, U.P. under Deposit Program
Utility Management
Construction of Parking for Two Wheeler and Four Wheeler vehicles at Head Office of UP Jal Nigam Rural, Lucknow
Supply,Installation,Testing and Commissioning of Ongrid Solar Photovoltaic PowerPlant conforming to MNRE specifications as amended, consisting of Mono/PolyCrystalline silicon solar cells,net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- A) Solar Photovoltaic Module of capacity 330Wp or above, manufactured in India, conforming to IS14286/IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than16.5%.PV modules used in solar power plants /systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. B) Power Conditioning Unit(PCU)of 350-800 V DC Input voltage range and 400V AC , three phase, 4wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3%and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. C) Data Monitoring System complete with accessories. D) Fixing of Array junctionbox & Main junction box with IP65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. E) Lightning and surge voltage protection. F) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1kV grade armoured power and control cables between solar modules, mainpower cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
SELECTION AND APPOINTMENT OF THE THIRD-PARTY INSPECTION AGENCY (TPIA) TO MONITOR PERFROMANCE AND FINANCIAL PROGRESS DURING OPERATIONS AND MAINTENANCE OF VARIOUS RURAL WATER SUPPLY SCHEMES FOR 10 YEARS IN UTTAR PRADESH.
Consultancy Cost for base year for 3 Circles
Construction of New Lab Building at Head Office of UP Jal Nigam Rural, Lucknow
Construction of New Lab Building at Head Office of UP Jal Nigam (Rural), Lucknow (As per Detailed BoQ attached with tender document)
Prevention of Pollution of River Ramganga by Interception Diversion of Drains of MBD Z3 Z4 with STP other Appurtenant works at MBD city in UP State under Namami Gange including 15Y Operation Maintenance period under Hybrid Annuity Based PPP Mode
A - Zone-3