Loading…
Loading…
9 results • Latest
FENCING WORK OF PROJECT LAND AND MISC. CIVIL WORK ADJACDENT TO NEW STAFF COLONY AND SABZI MANDI AT 1X660 MW PTEP, PANKI, KANPUR, (UP), 208020
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Overhauling of IInd pass of pressure part Duct soot blower and expansion joint etc of Unit 9 2x250MW HTPS Kasimpur Aligarh
Rectification by replacement of defective tube and bend of boiler pressure part tubes. (Including survey, cutting & lifting/lowering of 30 Nos. module/hangers each of LTSH / Economizer & re-assembly of the same). (As per scope of work)
SALE OF DRY FLY ASH FROM SILO OF 1X660 MW, PANKI THERMAL POWER PROJECT, UPRVUNL, PANKI, KANPUR
SALE OF DRY FLY ASH FROM SILO OF 1X660 MW, PANKI THERMAL POWER PROJECT, UPRVUNL, PANKI, KANPUR. TOTAL BUCKET QUANTITY= 7940000.00 MT IN 10 YEAR. Minimum bid quantity of Dry Fly Ash=750000.00 MT for 10 Years. Basic rate of DFA=Rs.150.00 per MT (Without Taxes).
Supply of SIEMENS Make LT Switchgear Spares in PTPP, PARICHHA, JHANSI (UP)-284305.
HF(14X51) TYPE FUSE HRC TYPE CYLINDRICAL CURRENT RATING 16 AMP siemens
Maintenance of water treatment plant, CPU system, Chemical dosing Sample collection testing and analyzing of steam water parameter of 2X500 MW, DTPS, Anpara, Sonebhadra
Routine Maintenance/Assistance in Operation at PT Plant, WSWS, Coal Settling Pond, CW Chlorination and CW Chemical House.
Repairing and Overhauling/ Fabrication of flocculators situated at permanent filtration plant of Anpara Thermal Power Station
Repairing and overhauling of flocculator as per below schedule- a. Complete repairing & revival of existing gear box. b.Fabrication and fitting of coupling set with pin and bush. c.Repairing of 06 nos chain sprocket of 17 teeth,pitch 1.25'' d. Repairing and reclamation of chain link of 03 number chain. e. Fabrication and fitting of guide attachement for tightening of chain (02 set). f.Fabrication/repairing of intermediate shaft OD -50 mm,L-1.5 Mtr. g. 02 nos Bearing block with bearing. h. Reparing of bearing housing,fabrication of gland bush,sealing bush, cover and its fitting with new bearing (02 set) . i. Fabrication of main drive shaft of agitator tank(02 No). j. Fabrication of bearing block with bearing for support the agitator shaft in the middle of tank(02 No). k. Repairing of end side bearing housing with fabrication of gland bush ,sealing bush,cover and its fitting with new bearing(02 No) . l. Complete fabrication of agitator frame & its fitting(02nos) . Above work shall be carried out for running of flocculator including all materials, labours, T&P & transportation complete.