Loading…
Loading…
4,554 results • Latest
Construction and Maintenance of Road from L037-(Link Road) Ladden to Sulgar km 9th to Thanoa Package No. JK14-4008, PMGSY-IV, Batch-I of 2026-27, Block-Jaganoo, District Udhampur (Using Waste Plastics 5.014 Kms) Length 5.014 Kms
Construction and Maintenance of Road L056-(Link Road) CVPP Bridge point Galhar to Chicha Package No. JK17-4211, PMGSY-IV, Batch-I of 2026-27, Block-Nagseni, District Kishtwar (Using Waste Plastics Length 11.900 Kms) Length 11.900 Kms
Repairing of Road from Dahuka More (PWD Road) to Gadaipur Nadi Bundh
Construction and Maintenance of Road from L034-(Link Road) Malti To Godhnu Road KM 5th to Loudhra Package No. JK14-4404, PMGSY-IV, Batch-I of 2026-27, Block-Panchari, District Udhampur. (Using Waste Plastics 16.000 Kms) Length 16.000 Kms
Construction and Maintenance of Road L064-(Link) Koti Bustand to Khangana Koti Via Chobotter Package No. JK04-4006, PMGSY-IV, Batch-I of 2026-27, Block-Doda, District Doda (Using Gbion Wall Length-6.200 Kms) Length 6.200 Kms
Construction and Maintenance of Road from L141-PMGSY Road Mari Dhakikote to Chhandi Package No. JK20-4277, PMGSY-IV, Batch-I of 2026-27, Block-Thakrakote, District Reasi. (Using Waste Plastics 6.650 Kms) Length 9.500 Kms
UT134823 Ruderswar Mandir to Chhamrota Motor Road
Repair and Renovation of the structural portions of the rooms allotted to the Assistant Engineers (AEs) and Junior Engineers (JEs) of WBSRDA Howrah Division-II Office
UT134782 L029 Bonga to Kyan Idalgaon MR Stage I and II
UT134787 L021 NH34 to Aungee MR Stage-I and II