| 1 | L1₹9.6 CrAdmitted-Finance 54 AKASH DEEP COLONY CHAKRATA ROAD DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹9.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.3 CrAdmitted-Finance 12 SADAR BAZAR CHAKRATA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹10.3 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical DALANWALA DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | - | - | Rejected-Technical reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Amit Joshi L2 | SURAT SINGH AND SONS L1 |
|---|---|---|---|---|---|
| 0.00Laying and Jointing PVC Pipe. Heading | |||||
| 1.00 | Excavation in Hill Side Cutting for Construction in all types of Soils, Rocks and E&B ect. As met at site, true to lines as per Pland, L-Section, Cross Slope, Super Elevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all Lifts & Leads required as per Drawings by mechanical means or manual means without otherwise damaging the Forest, Forest Land, Utilities, Private and Public Properties, completion of the work. | 1 | L.S. One Job | 51,96,047.72 ₹61,31,336.31 | 48,00,000 ₹56,64,000 Lowest |
| 2.00 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause. | 10,000 | Cum | 52.75 ₹6,22,450 | 50 ₹5,90,000 Lowest |
| 3.00 | Removal of Slip Clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge in all type of soil and rock by mechanical means or manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications. | 1,911.77 | Cum | 68.45 ₹1,54,415.57 | 66 ₹1,48,888.65 Lowest |
| 4.00 | Excavation in Foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge. | 2,524.74 | Cum | 435.75 ₹12,98,183.44 | 425 ₹12,66,157.11 Lowest |
| 5.00 | Excavation in Structures By Mechnical Means in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD. | 3,399.2 | Cum | 218.17 ₹8,75,092.09 | 210 ₹8,42,321.76 Lowest |
| 6.00 | Construction of R.R. Stone Masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | 2,012.62 | Cum | 4,726.47 ₹1,12,24,853.9 | 4,250 ₹1,00,93,289.3 Lowest |
| 7.00 | Random Rubble Stone Masonry Laid Dry for structures by locally available approved stone ncluding supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | 2,577.98 | Cum | 2,360.85 ₹71,81,744.42 | 2,180 ₹66,31,595.75 Lowest |
| 8.00 | Cement Plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | 896.55 | Cum | 4,752.51 ₹50,27,818.15 | 4,590 ₹48,55,894.11 Lowest |
| 9.00 | HP Stone Filling in back of structures including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | 1,223.67 | Cum | 1,080.43 ₹15,60,065.94 | 1,050 ₹15,16,127.13 Lowest |
Tender Value
₹9.7 Cr
EMD Value
₹20.7 L
Closing Date
24 Mar 2026, 1:00 pmClosed
C.E. U.R.R.D.A.
1st Floor Directed of Panchayati Raj
UT134823 Ruderswar Mandir to Chhamrota Motor Road
2026_CCUK_146532_1
UT134823
National Competitive Bid
Civil Works - Roads
Item Rate
450 days
Purola
Please Refer Technical Bid
3 documents required · 3 mandatory
₹5,900
₹20.7 L
Mussoorie
19 Aug 2026
7 Feb 2026
24 Mar 2026
7 Feb 2026
24 Mar 2026
17 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 1 | Excavation in Hill Side Cutting for Construction in all types of Soils, Rocks and E&B ect. As met at site, true to lines as per Pland, L-Section, Cross Slope, Super Elevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all Lifts & Leads required as per Drawings by mechanical means or manual means without otherwise damaging the Forest, Forest Land, Utilities, Private and Public Properties, completion of the work. | - | L.S. One Job | 52,30,043 | - |
| 2 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause. | - | Cum | 53.1 | - |
| 3 | Removal of Slip Clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge in all type of soil and rock by mechanical means or manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications. | 1 | Cum | 68.9 | ₹68.83 |
| 4 | Excavation in Foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge. | 1 | Cum | 438.6 | ₹438.16 |
| 5 | Excavation in Structures By Mechnical Means in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD. | 1 | Cum | 219.6 | ₹219.38 |
| 6 | Construction of R.R. Stone Masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | 1 | Cum | 4,757.39 | ₹4,752.63 |
| 7 | Random Rubble Stone Masonry Laid Dry for structures by locally available approved stone ncluding supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | - | Cum | 2,376.3 | - |
| 8 | Cement Plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | 1 | Cum | 4,783.6 | ₹4,778.82 |
| 9 | HP Stone Filling in back of structures including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | - | Cum | 1,087.5 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.03 MB
ut134823plan.pdf
Additional Documents • 4.32 MB
ut134823.pdf
Tender Documents • 3.96 MB
BOQ_226977.xls
BOQ • 0.31 MB
corrigendum06.pdf
PDF • 0.21 MB
Chamrotta.pdf
PDF • 2.61 MB
Corrigendum03.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].