Loading…
Loading…
4,597 results • Latest
Construction and Maintenance of Road from L031-Link Road M 1ST OF SYEDAN MOHALLA ROAD TO DOONGA BAN VIA DAGOORA Package No. JK12-4374, PMGSY-IV, Batch-I of 2026-27, Block-Panjgrian, District Rajouri (Using Waste Plastics Length 6.500 Kms) Length 6.50
Construction and Maintenance of Road from L024-Saranoo Matote to Patoga (Link Road) Package No. JK12-4200, PMGSY-IV, Batch-I of 2026-27, Block-Dhangri, District Rajouri (Using Waste Plastics 6.000 Kms) Length 6.000 Kms
Permanent restoration of road, JK14-506, JK14-284, JK14-621, JK14-304, JK14-398
Permanent restoration of road, Kainthgali Block Boundary Udhampur to Malti, Pkg No. JK 14 551
UT084542 Devrana to Thunda Motor Road Stage I and II
Construction and Maintenance of Road from L619-(Link Road) BMG road Tramla to Ghoragali Package No. JK20-4204, PMGSY-IV, Batch-I of 2026-27, Block-Mahore, District Reasi. (Using Waste Plastics 10.000 Kms) Length 10.000 Kms
Construction and Maintenance of Road L040-(Link Road)Mandi gagrian Road Km 6.750 to Khari Moori Package No. JK11-4052, PMGSY-IV, Batch-I of 2026-27, Block-Mandi, District Poonch (Using Waste Plastics Length 3.990 Kms) Length 3.990 Kms
Construction and Maintenance of Road L041-(Link Road)Km 2nd of Bharat Keshwan road to Gujjar Basti-Drumri Package No. JK04-4037, PMGSY-IV, Batch-I of 2026-27, Block-Dali Udhyanpur, District Doda Length 4.000 Kms
Permanent Restoration of Road MRL-01 Jandial to Rabta Package No.- JK05-3012, Length 17 Km , Block MATHWAR, and JABTA TO CHALLANI PACKAGE NO.JK05-97,LENGTH 5 KM, BLOCK PURMANDAL, DISTRICT JAMMU.
Permanent Restoration of road from Yarikhah to Langkhull Package No Jk01-409