Loading
Loading…
Loading…
21 results • Recent activity
REPLACEMENT OF OLD ACBs AND ISOLATORS IN VARIOUS SUBSTATIONS
As per tender document
Supply and Commissioning of Ultrasonic Anemometers for LLTT cranes and 150 Ton RMG crane
Replacement of LT Panel at 2RD Substation
The work involves conducting mock-up tests at both the Building Dock and Repair Dock in CSL. Additionally, the work includes the excavation of anodes and, if necessary, the design of a new ICCP system based on the mock-up test results.
Work involves dismantling and removal of damaged GI pipes, cables, anodes and reference electrodes. Supply and installation of new anodes, reference electrodes, GI pipes and cables with supports, and replacement of the existing TRU system