Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | -10.92% | ₹3.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.6 LAdmitted-Fee/PreQual/Technical/Finance | -5.10% | ₹3.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.1 LAdmitted-Fee/PreQual/Technical/Finance 2ND FLOOR KALOOR BUSSTAND COMPLEX BUS STAND COMPLEX KALOOR BUSSTAND COMPLEX ERNAKULAM KERALA 682017 UDYAM KL 02 0009309 32AAGCS5821G1ZK R M | ERNAKULAM | KERALA | 682017 | +6.45% | ₹4.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.5 LAdmitted-Fee/PreQual/Technical/Finance | +18.00% | ₹4.5 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | +19.18% | ₹4.6 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.6 L
EMD Value
₹9,200
Closing Date
31 Jul 2026, 2:00 pmClosed
AGM (UM-EL)
AGM (UM-EL), U and M Department, Cochin Shipyard Ltd., Kochi - 682015
As per tender document
2026_CSL_283628_1
CSL/UM/EM-3/T/309/26-27
Limited
Electrical Works
Turn-key
30 days
CSL, Kochi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,200
Yes
1 Aug 2026
10 Jul 2026
1 Aug 2026
10 Jul 2026
31 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling, inspection, cleaning, overhauling, reassembly, and refixing of a 3-phase, 55 kW squirrel-cage induction motor, including replacement of bearings, oil seals, cooling fan, and other damaged consumable parts as required; cleaning of the stator and rotor assemblies; lubrication of bearings with approved-grade grease; painting with one coat of zinc chromate primer and two coats of synthetic enamel paint; testing and commissioning, complete in all respects, including transportation as per scope of work
Note: Supply of all materials incl. bearings, oil seals, cooling fan etc. is under the scope of the contractor | 12 | Nos | 26,650 | ₹3,19,800 |
| 1.02 | Rewinding of 3-phase, 55 kW squirrel-cage induction motor as per scope of work (only if required) | 1 | Nos. | 46,500 | ₹46,500 |
| 1.03 | Supply and installation of terminal block as per scope of work (only if required) | 12 | Nos | 1,500 | ₹18,000 |
stage.html
html • 0.02 MB
finance_330918.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
Tender_Notice.pdf
Tender Documents • 8.20 MB
BOQ_330918.xls
BOQ • 0.27 MB
Corrigendum_Extension.pdf
PDF • 1.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].