Loading…
Loading…
2,447 results • Latest
Substation Clamps/Connectors (Q3)
Substation Clamps/Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply Purchase for Genral M&R work using in Substation for 220 KV Azizpur under ETD Shahjahanpur; Substation; Service Provider
Substation Clamps/Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Register (V2) (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Shifting Loading Unloading and Carriage work at 132 KV Substation Banda under ETD SPN; Substation, Switchyard, Vehicles; Service Provider
Register (V2) (Q4), File/Folder (V3) (Q4) (3 (3 ))
Operation and Maintenance Of Electrical Systems/Electrical Installations - Erection of 33 11 KV line strengthening LT Line strengthening and construction of new 11kv line and installation of new additional 16 25 100 kva DT work on Semi Turnkey basis ..
Custom Bid for Services - Shifting of Lines Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Silica Gel (V2) Conformingto IS3401 (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
Silica Gel (V2) Conformingto IS3401 (Q3)
hp OEM Toner Cartridge Manufactured by HP India Sales Private Limited
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply for Genral O&M work material at 220 KV Substation Azizpur under ETD Shahjahanpur; Substation, Switchyard; Service Provider
Operation And Maintenance Of Switchyard - As per enquiry
Operation And Maintenance Of Switchyard - As per enquiry
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COMPREHENSIVE MAINTENANCE OVERHAULING FOR 63 KVA DG SET AT 132 KV SUBSTATION JALALABAD UNDER ETD SPN; Substation, Switchyard; Service Provider
MALE CONTACT, FEMALE CONTACT, ROTATING HEAD, ISOLATOR, CB, CT
Dell Intel Core i5-14500T All in One PC
microtek Line Interactive UPS with AVR of Rating 1.0 KVA With Warranty of 2 Years
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000km x 312 hrs; Local, Monthly Basis Cab & Taxi Hiring Services - SUV; 1800km x 312 hrs; Local
hp High End Desktop Computer with Warranty 5 Year
hp Sheet Fed Scanner with Power Adapter/Cable
microtek Line Interactive UPS with AVR of Rating 1.0 KVA With Warranty of 2 Years
hp High End Desktop Computer with Warranty 5 Year
hp Electrophotography/Xerography (Laser/LED) Monochrome (Black) A3, Legal and A4 size Multifunction Machine Printer
microtek Line Interactive UPS with AVR of Rating 1.0 KVA With Warranty of 5 Years
Handling and Transport on Lumpsum Basis - Handling & Transport Service, FILLING OF CLEAN SAND FOR SAND PITS ALSO INCLUDED AS SITE REQUIREMENTS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Substation Premises; Oil Testing; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Residential; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 kV Substation Manth; Repairing of the AC Distribution Board ACDB installed in the switchyard; including replacement of damaged copper strips terminal blocks TBs and ..
145KV Isolator ARM MALE FARADAY MAKE(as per sample)
Substation Clamps/Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 kV Substation Manth; Repairing of 5 HP 3 phase 415 V sump house motor; including dismantling opening of the motor necessary repair and replacement of defective compo..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling of radiator valve and replacement of its gasket centrifuging of TF oil and other associated works at 132 KV S/S Naini Complex under ETD III Prayagraj; Substa..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Providing and replacement of PRV of 63 MVA T/F I (CGL make) at 132 KV S/S GIS OPH, Under ETD-II Prayagraj; Substation, Switchyard; as per boq
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Outstation 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Custom Bid for Services - Electrical line installation work for scheme Rs seventy one and paisa fifty sq meters and other deposit head related HT and LT Line works as comes time to time under EDD Laxminagar Mathura Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Substation Clamps/Connectors (Q3)
Fiber Optic Patch Cord (V2) (Q3)
Non-Aadhaar Based Biometric Attendance System (Q2)
Operation And Maintenance Of Substation - WORK OF OVERHAULING OF 220KV CIRCUIT BREAKER AT 220KV FARIDNAGAR SUBSTATION UNDER ETD MURADNAGAR
NIFPS system
Substation Clamps/Connectors (Q3)
Custom Bid for Services - ---- Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Substation, Switchyard, Power House Equipment; Service Provider