Loading…
Loading…
2,447 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Substation; Power House Equipment, Substation, Switchyard; Service Provider
Digital Timer (Q3)
Single phasing preventer Relay (SPPR) (Q3)
Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3)
Manpower Outsourcing Services - Fixed Remuneration - Admin; Computer Operator; Graduate
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment; Service Provider
Substation Clamps/Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Sub Station; Substation, Switchyard; Service Provider
Goods Transport Service – Per MT per KM Based Service - 40MM BAR; HAVY DUETY TRUCK; 21 FT Truck
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Custom Bid for Services - Cable Laying work Similar Category Electric Cabling Service
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Substation Clamps/Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Operation And Maintenance Of Substation - REPAIRING OF 120 Watt led light by replacement
Operation And Maintenance Of Substation - REPAIRING OF 120 Watt led light by replacement of its defective led strip PCB or any other part up to job satisfactory
High Dielectric strength and thermal stability SF6 Gas for Circuit Breaker, 33KV CT Rod Dia 15mm, 33KV CB Clamp for panther to Panther, 33KV Triping Coil CGL Make, 33KV Bushing Clamp made of Brass for 63MVA LV Side, 33KV Isolator Jaw 2000A, 33KV Isolator Jaw 1250A, 33KV Isolator Blade 1250
Supply of Vacuum Interrupter and VCB Pole Unit for 33KV
Air Break Contactors (Q3)
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - AT 400 KV S/S GREATER NOIDA; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - AT 400 KV SUBSTATION; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - AT 400 KV S/S GREATER NOIDA; Substation; Service Provider
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Switchyard, Substation, Power House Equipment, Electrical System or Installation; Service Provider
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Buyer
Facility Management Services - LumpSum Based - Commercial; SITC of cooling tower & AHU; Consumables to be provided by service provider (inclusive in contract cost)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of 10/16 KVA to 25 KVA Wound Core Damaged Distribution Transformer at Jainpur (Kanpur Dehat) under EWD, Kanpur; Damaged Distribution Transformer; As per BOQ an..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of 10/16 KVA to 100 KVA Damaged Distribution Transformer at Workshop Agra under EWD, Agra; Damaged Distribution Transformer; As Per BOQ and GEM
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Substation, Switchyard; Service Provider
Register (V2) (Q4)
Register (V2) (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of Aluminium metal frame by replacing the hinge and pivot bearing holding at 400KV GIS Agra South; Replacement of damaged and broken and cracked glass on door .., and Installation of Plant/Systems/Equipments (Version 2) - Replacement of damaged broken cracked glass on door Sliding window control room entrees gate etc; This includes replacing of glass with same thickness new glass of same ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Shifting and Proper arrangement of material at 132KV SS Kirawali Agra; Which includes cable drum conductor roll drum tower parts CT and PT and other material with help o..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work of fabrication canopy shed on Top of fire Extinguisher Cylinder installed at 220KV SS Kirawali Agra; The help of Cement sheet which includes cutting welding and gro..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair & fixing of Substation Board of size 8x6 ft duly made out of Steel board with proper fixing arrangement; using angles and grouting using M20 Grade Concrete mix in..
Safe carriage Of various type of Control and relay panel
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation, Switchyard; Service Provider
Operation And Maintenance Of Substation - CLEANING WORK OF JUNGLE INCLUDING UPROOTING WORK
Operation And Maintenance Of Substation - cutting grass and cleaning rubbish materials in front and backside of material store no-2 and this rubbish material and grass dumped in a safe place with the help of men power
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Unbranded Electrical Terminals CAA- 240/12.7 mm Stud Hole
MENGINER 32 A 2P Circuit Breaker for DC Operation
Unbranded 415 Volt Hrc Fuse
Philips 400 W High Pressure Sodium Vapour Lamps (Hpsv Lamps)
Rain Suit (Q3)
L & T DN0 Type MCCB With Thermal Magnetic/ Microprocessor Based Trip Unit
Operation And Maintenance Of Substation - CHEMICAL EARTHING AT 220 KV S/S MURADNAGAR UNDER ETD- MURADNAGAR