Loading…
Loading…
1,027 results • Latest
For Release of New Service Connections
Construction of New 33/11kV Indoor type Substation (SCADA Enabled) with associated 33kV and 11kV lines at (i) Ramjhula (ii) Bairaj-2/Gumaniwala in Rishikesh on turnkey basis under RDSS in Uttarakhand State.
Providing Skylift with Man Power for Town Area Lohaghat under EDSD Lohaghat Distt. Champawat
Providing Skylift with Man Power for Town Area Champawat under EDSD Champawat
Providing Skylift with Man Power for Town Area Tanakpur under EDSD Tanakpur Distt. Champawat
Construction of New 11 Kv , LT Lines and 11/0.4 Kv DTR for NSC to various Consumers under Tanakpur section under EDSD Tanakpur Distt. Champawat.
Construction of New 11 Kv , LT Lines and 11/0.4 Kv DTR for NSC to various Consumers under Banbasa section under EDSD Tanakpur Distt. Champawat.
Intermidiate additional Pole Between Long Spans in 11 Kv and LT Line in Village Bamnpuri, Chandni, Bhulwagoth, Gadikot, Pampapur at Banbasa and Devipura Feeder EDSD Tanakpur Distt. Champawat
Providing 1 No. DEO by outsource agency under EDD Central for one year
Supply of Various Type Non-Centralized Material Used For 33/11 KV S/S Chilkiya Ramnagar Under EDSD (Town) Ramnagar Work Giving New Connection (UERC)
Work of Bifurcation of 11 kV Salempur Feeder due to Overloading under EDSD I Ramnagar under EDD Ramnagar under EDC Roorkee
Supply and Overhauling of 33KV Line at Someshwar Section of EDSD I Almora
Supply and Erection of 181 Nos. New pole in variour Villages at Someshwar Section, EDSD I Almora
Supply And Construction of HT, L/T and TF for Giving Service Connection in EDSD I Almora Under UERC Head 2025-26
Supply and Installation of ACB Pannel on different capacity of Transformers in Dharanaula Section under EDSD I, EDD Almora
Supply and Repairing of HT and LT line for Vill Simalti, Uregi and Kapileshwer in Lamgara Section of EDSD II Almora
Supply and Electrification of Bhajaneshwar Mandir in Someshwar Section of EDSD I Almora
Annual Maintenance of work 33/11 KV Sub-station Masi under EDD Bhikiyasain
Annual Maintenance of work 33/11 KV Sub-station Bhikiyasain under EDD Bhikiyasain
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Borbalara under Capital (C.M. Ghosna No. 1675/2021)
Replacement of 11 KV ACSR to AAAC to different location under Kausani Section under EDD Bageshwar
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Kuwari under Capital (C.M. Ghosna No. 1675/2021)
Supply and fixing of 33 KV Fault Inducator in Vijaypur and Banlekh under EDD Bageshwar
Mechanized Cleaning and General Up keeping of Office Complex at V.C.V. Gabar Singh Urja Bhawan, Dehradun.
WORK OF CONSTRUCTION AND INSTALLATION OF 11/0.433 kV 400 KVA COMPACT SECONDARY SUB-STATION NEAR BYPASS ROAD (AROMA COFFEE), VIKASNAGAR UNDER EDSD, VIKASNAGAR UNDER EDD, VIKASNAGAR
WORK OF CONSTRUCTION AND INSTALLATION OF 11/0.433 kV 990 KVA COMPACT SECONDARY SUB-STATION NEAR 33/11 KV SUB-STATION, VIKASNAGAR UNDER EDSD, VIKASNAGAR UNDER EDD, VIKASNAGAR
WORK OF CONSTRUCTION AND INSTALLATION OF 11/0.433 kV 990 KVA COMPACT SECONDARY SUB-STATION NEAR DIVISION OFFICE, VIKASNAGAR UNDER EDSD, VIKASNAGAR UNDER EDD, VIKASNAGAR
SHIFTING OF LINES AT KUNTI NAALA ON REQUEST OF IRRIGATION DEPARTMENT UNDER DEPOSIT HEAD
Annual Maintenance work of 33/11 KV Sub-Station Kapkot under EDD Bageshwar
Annual Maintenance work of 33/11 KV Sub-Station Karmi under EDD Bageshwar
Annual Operation work of different 33/11 KV S/S Almora under EDD Almora
Annual maintenance work of 33/11 KV Sub-Station Dharanaula under EDD Almora
Construction of new 11KV Line from Gaurikund to Lincholi for alternate supply to Dham on Semi Turnkey Basis in EDD, Rudraprayag
Providing and Fixing of T and P under Matkota Substation
SUPPLY LT PVC Cable 4x10 Sq.mm (Un-armoured) 300Km
SUPPLY OF 8.5Meter Long Steel Tubular Pole SP-23 ( Bottom Portion Hot Dip Galvanized) 12,000Nos
Work of Construction of New 11 kV Line on request of M/s BPCL Landhora under EDSD Landhora under EDD Rural under EDC Roorkee
For MRI of KCC
Increasing Capacity and Installation of New DTR work of 06 No. Different DTR on Feekapar Feeder under 33/11 KV S/S Jaspur, EDSD(First), Jaspur under the Head of Capital (SI).
Installation of Compact Distribution Systems and associated works in Haridwar for Kumbh Mela-2027
Work of replacement of damaged LT AB cable and laying new cable under Kunda Feeder of 33/11 KV S/S Garhinegi, EDSD(Second), Jaspur
Work of replacement of damaged LT AB cable and laying new cable under Maldhan Feeder of 33/11 KV S/S Garhinegi, EDSD(Second), Jaspur
Work of replacement ofdamaged LT AB cable and laying new cable under Garhinegi Feeder of 33/11 KV S/S Garhinegi, EDSD(Second), Jaspur
Work of replacement of damaged LT AB cable and laying new cable under Manpur Feeder of 33/11 KV S/S Garhinegi, EDSD(Second), Jaspur
Increasing Capacity work of Power T/F (No. 01) from 8 MVA to 12.5 MVA under 33/11 KV S/S Amritpur Patti, EDSD(First), Jaspur under the Head of Capital (SI).
Increasing Capacity work of Power T/F (No. 02) from 8 MVA to 12.5 MVA under 33/11 KV S/S Amritpur Patti, EDSD(First), Jaspur under the Head of Capital (SI).
Increasing Capacity work of Installation 16 Nos New T/F under 33/11 KV S/S Garhinegi, EDSD(Second), Jaspur under the Head of Capital (SI).
Increasing Capacity work of Power T/F (No. 07) on Kunda Feeder under 33/11 KV S/S Amritpur Patti, EDSD(First), Jaspur under the Head of Capital (SI).