Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.0 LAdmitted-Finance RUDRAPRAYAG | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹58.0 L | L1 | Admitted-Finance |
| 2 | L2₹61.3 L+₹3.4 L (5.81%)Admitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹61.3 L+₹3.4 L (5.81%) | L2 | Admitted-Finance |
| 3 | L3₹62.0 L+₹4.1 L (7.03%)Admitted-Finance BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹62.0 L+₹4.1 L (7.03%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mamtainfra Power L2 | Aarna Electrical And Co L3 | DEVENDRA SINGH BHANDARI L1 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | ||||||
| 2.00 | Nut & Bolts | 35.5 | KG | 10,650 ₹10,650 | 11,005 ₹11,005 | 7,100 ₹7,100 Lowest |
| 3.00 | PP & CLAMP WITH N&B ST POLE SP-55 | 50 | NOS | 17,750 ₹17,750 | 18,000 ₹18,000 | 12,750 ₹12,750 Lowest |
| 4.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 367 | NOS | 1,31,753 ₹1,31,753 | 1,33,955 ₹1,33,955 | 95,053 ₹95,053 Lowest |
| 5.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 259 | NOS | 92,981 ₹92,981 | 94,535 ₹94,535 | 66,563 ₹66,563 Lowest |
| 6.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 614 | NOS | 1,57,184 ₹1,57,184 | 1,58,412 ₹1,58,412 | 95,784 ₹95,784 Lowest |
| 7.00 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 242 | NOS | 67,760 ₹67,760 | 68,970 ₹68,970 | 63,162 ₹63,162 Lowest |
| 8.00 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 242 | NOS | 65,340 ₹65,340 | 68,970 ₹68,970 | 63,162 ₹63,162 Lowest |
| 9.00 | 11 KV Vertical type ISOLATOR | 10 | NOS | 3,98,000 ₹3,98,000 | 4,00,000 ₹4,00,000 | 3,95,000 ₹3,95,000 Lowest |
| 10.00LABOUR PORTION | ||||||
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
18 May 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Construction Of additional 11KV Line from 33/11KV S/s Guptkashi To Fata under Capital head on Semi Turnkey Basis
2026_UPCL4_94983_1
01/EDC(K)/2026-27
Open Tender
Repair and Maintenance Works
Item Rate
180 days
RUDRAPRAYAG
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
EE EDD GOPESHWAR
₹1.2 L
18 Jun 2026
2 May 2026
19 May 2026
2 May 2026
18 May 2026
3 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUPPLY OF MATERIAL PORTION | - | - | - | - |
| 2 | Nut & Bolts | 35.5 | KG | - | - |
| 3 | PP & CLAMP WITH N&B ST POLE SP-55 | 50 | NOS | - | - |
| 4 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 367 | NOS | - | - |
| 5 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 259 | NOS | - | - |
| 6 | PP & CLAMP WITH N&B ST POLE SP-23 | 614 | NOS | - | - |
| 7 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 242 | NOS | - | - |
| 8 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 242 | NOS | - | - |
| 9 | 11 KV Vertical type ISOLATOR | 10 | NOS | - | - |
| 10 | LABOUR PORTION | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendedocument.pdf
Tender Documents • 1.04 MB
BOQ_112336.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .