Loading…
Loading…
22 live9 closing this weekmost from PWD and Department Of Military Affairs
22 results • Latest
Desert Shoes Size-8, Desert Shoes Size-9, Desert Shoes Size-10, Tactical Trouser Size-32, Tactical Trouser Size-34, Tactical Trouser Size-36
Inverter 3.5 KVA with 04 x 220 MAH Batteries, DVR 8 Channel, Brief Case, Cat 6 Cable 305 Mtr, HDMI Cable 25 Mtr, HDMI Cable 10 Mtr, Tarpaulin 15 x 12, Printer Sharing Switch
Hiring of Social Media Agency - Content creation, Content response and content moderation, Campaign Management, Response management/Helpdesk support, As per ATC; Hindi, English; Facebook, Twitter, Instagram, WhatsApp, YouTube
Construction of MRP at Garurchatti, located on the newly constructed pilgrimage route in Sh. Kedarnath Dham
Construction of Engineering Block at Garurchatti, located on the newly constructed pilgrimage route in Sh. Kedarnath Dham
Construction of Admin Building at Garurchatti, located on the newly constructed pilgrimage route in Sh. Kedarnath Dham
Construction of Cement Plum Benches at Rambara-Garurchatti Km. 9 to Km. 16 in Sh. Kedarnath Dham yatra route.
Construction of Shelter Shed at Garurchatti, located on the newly constructed pilgrimage route in Sh. Kedarnath Dham.
Construction of Disaster Management Block at Garurchatti, located on the newly constructed pilgrimage route in Sh. Kedarnath Dham.
Construction of a folding pedestrian bridge at Garudchatti, located on Sh Kedarnath Dham bridle yatra route- to connect various amenity buildings and facilitate the smooth conduct of the pilgrimage.
Construction of Police Chowki with Residential building at Garurchatti, located on the newly constructed pilgrimage route in Sh. Kedarnath Dham
Hybrid Security Fence, CCTV Camera, Alarm System, Pre Fabricated Shelter
1.5 Ton Window AC, 1.5 Ton Split AC, 1 Ton Split AC, Stabilizer 170 volt to 270 volt, Washing Machine 9 kg Fully Automatic, Dryer 9.6 KG fully automatic, Iron Press 7 KG Dry, Iron Press Steam
ATM Universal testing machine (Q3) (3 (3 ))
Construction of a 6.00 meter RCC culvert on the access road to the Court building in Agastyamuni Development Block, within the Kedarnath Assembly constituency of Rudraprayag district, under the State Plan
BASED STROM SEWER NETWORK PLAN FOR RUDRAPRAYAG DIST. RUDRAPRAYAG
Construction of 02 classrooms at GUPS Palakurali
DEVELOPMENT OF dwitiy KEDAR , SHRI MADMAHESHWAR DHAM AT DISTT RUDRAPRAYAG
CONSTRUCTION OF LASTER (LEFT) CANAL IN JHAKHOLI BLOCK OF RUDRAPRAYAG DISTRICT.
Annual Operation and Maintenance of Kaliganga-II SHP (2x2.25 MW located in Tehsil Ukhimath District-Rudraprayag.
Dimensional Consignments (HT-03) of 12-axle configuration carrying approx 100 Tonne Wire Ropes on bridge approaches and curves for the Kedarnath and Hemkund Sahib Ropeway Projects on Rudraprayag-Sonprayag (NH-107) and Rishikesh-Govindghat (NH-07