Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
5 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Jal Sansthan Rudraprayag
Office of Executive Engineer Uttarakhand Jal Sansthan Rudraprayag
Construction of Sonprayag water supply scheme under NABARD
2026_UKJS_102616_1
2180/E TENDER /21/2026-27 dt. 12.11.26 Sonprayag NABARD
Open Tender
Civil Works - Water Works
Item Wise
Sonprayag
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer Jal Sansthan Rudraprayag
₹3.6 L
Rudraprayag
18 Nov 2026
18 Nov 2026
8 Dec 2026
18 Nov 2026
5 Dec 2026
25 Nov 2026
21 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SOURCE WORK
Construction of RCC BFG including all materials, labour, T&P etc. required for proper completion of work | 2 | No | - | - |
| 2 | Construction of Extra length R.C.C Cross wall including supply of all materials, labour, T&P etc. required for proper completion of work | 20 | RM | - | - |
| 3 | Construction of RCC roughninh filter including all materials, T&P etc | 2 | No | - | - |
| 4 | CONSTRUCTION OF SCPCC DRAIN including supply of all labours, materials, T&P etc complete for proper completion of work . | 25 | RM | - | - |
| 5 | Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(1.2 x1.2 x1.0) | 8 | Nos | - | - |
| 6 | Protection Work
RR Stone Masonry 1:6 including supply of all materials, labour, T&P etc. complete | 58.13 | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level
Pcc 1:4:8((1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) | 2.93 | Cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone
aggregate 40 mm nominal size) | 3.9 | Cum | - | - |
| 9 | RR Dry including supply of all materials, labour, T&P etc. complete | 22.5 | Cum | - | - |
| 10 | RCC 1:1.5:3 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 14.4 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
SonprayagNABARD1.pdf
Tender Documents • 1.76 MB
BOQ_120806.xls
BOQ • 0.67 MB
SonprayagNabardCorig.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .