Loading…
Loading…
73 results • Latest
Engaging of 1No EX245 Proclainer with long broom for cleaning of outfall drains, major drains and canals in AMOH-I Area in Vijayawada Municipal Corporation for 40 Days
Engaging of Big Proclainers fitted with special purpose long broom of 60 feet length broom to Eluru Canal for desilting and removal of floating trash on canal water bodies including cost of fuel, driver charges etc., complete and as directed by the departmental authorities. Note: 1. The broom length atleast 60feet (Arm length). 2. The agency should maintain log book duly certified by the Biologist. 3. Payment made only on log book duly certified by the Biologist.
Desilting of major outfall katcha drain from Krishna Sai enterprises (existing Box Culvert-1) to Budameru and desilting of Major outfall katcha drain from Jakkampudi junction (existing Box Culvert-2) to Budameru in 58th Division for Summer Action Plan-2026
Engaging of Big Proclainers fitted with special purpose long broom of 60 feet length broom to Eluru Canal for desilting and removal of floating trash on canal water bodies including cost of fuel, driver charges etc., complete and as directed by the departmental authorities. Note: 1. The broom length 8.50mts to 9.00mts & Arm length is 6.00mts to 6.50mts. 2. The agency should maintain log book duly certified by the Biologist. 3. Payment made only on log book duly certified by the Biologist.
Desilting of major outfall drain from Gunadala Railway Grate to 33 vents in AE-7 Section by Mechanical means for Summer Action Plan-2026
Engaging of Big Proclainers fitted with special purpose long broom of 60 feet length broom to Eluru Canal for desilting and removal of floating trash on canal water bodies including cost of fuel, driver charges etc., complete and as directed by the departmental authorities. Note: 1. The broom length 8.50mts to 9.00mts & Arm length is 6.00mts to 6.50mts. 2. The agency should maintain log book duly certified by the Biologist. 3. Payment made only on log book duly certified by the Biologist.
Desilting of outfall drain from Nunna Road to budameru via Ambitus school back side in 1st Division (by mechanical means) in Circle-II Area for the year 2026
Removal of wet silt and sludge by manual means from sullage drains with aid of baskets and vessels. (LAB-00676)
Desilting of out fall drains to both sides of Dabakotlu Road and St.Anns American Hospital Road from Nunna Road to Excel plant road in Ajith Singh Nagar 58th and 59th Division of AE-7 Section (By manual means) for summer action plan-2026
Removal of wet silt and sludge by manual means from sullage drains with aid of baskets and vessels. (LAB-00676) Conditions: Wet silt should be remove bottom of the drain with cross bunds with sand bags and bailing out of the water then the removing of the silt upto bottom of the drain and photos are to be submitted for every 50mts stretch to show the bottom of the drain.
Desilting of from West side of Nunna Road from Railway track to Budameru Outfall drain from (Manual means & Mechanical means) in Circle-II Area for the year 2026
Removal of wet silt and sludge by manual means from sullage drains with aid of baskets and vessels. (LAB-00676)