Loading
Loading…
Loading…
118 results • Recent activity
Revolving Chair (V5) (Q2) ( PAC Only ), Revolving Chair (V5) (Q2)
Repairs to Galvalume Fencing along the periphery of East Break Water at fishing harbour in view of IFR 2026
100A MCCB 3 Pole, 200A MCCB 3 Pole, 250A MCCB 3 Pole, 400A MCCB 3 Pole, 630A MCCB 3 Pole, 800A MCCB 3 Pole
Providing new Wiring, Lighting and Air Conditioners in DLB and MMTC Buildings of VPA
Providing paintings and facelift to kerbs, Inside the vicinity and backup areas in Cruise Terminal in view of IFR 2026.
Removal of silt and floating material from major geddas and transportation of silt and floating materials for a period of 2 years i.e. from 2025 to 2027 in V.P.A