Loading…
Loading…
78 results • Recent activity
Day to day Operation maintenance of distribution system and rising main (CI/DI/AC/UPVC pipe) of Bandipur , Bilkanda Z-I II ground Based W/S Scheme 180 cum / hour capacity Iron Elimination Plant (Pressure type) at Bilkanda Z-II Head works site
Day to Day Operation maintenance of distribution system and rising main (CI/DI/AC/UPVC pipe) of Kanchiara Surface Based W/S Scheme under Amdanga block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte.for 306 days.
Day to day Operation maintenance of distribution system rising main (CI/DI/AC/UPVC pipe) of Barakpur Zone-I Ichhlampur Zone-II ground water Based W/S Scheme under Bongaon Block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte.
Day to day Operation maintenance of distribution system rising main (CI/DI/AC/UPVC pipe) of Paschim Panchberia Zone-I , Paschim Panchberia Zone-II , Gainpur Paikpara Zone-I ground water Based W/S Scheme under Bongaon Block within the jurisdicti
Day to day operation maintenance of Booster Station -I AND II of North 24 Pgs. Arsenic area W/S Scheme. for 365 days.
Day to day Operation maintenance of distribution system rising main (CI/DI/AC/UPVC pipe) of Dighari, Santoshpur Zone-I Santoshpur Zone-II ground water Based W/S Scheme under Bongaon Block within the jurisdiction of North 24 Pgs W/S Division I,