Loading…
Loading…
78 results • Recent activity
Maintenance of Arboriculture (Garden) at Mangal Pandey Water Treatment Plant including approach road for Main Gate to Plant Gate, top of CWR (Except River Side) under North 24-Pgs W/S Divn-I, P.H.E. Dte. for 365 days.
Day to Day Operation maintenance of distribution system and rising main (CI/DI/AC/UPVC pipe) of Beraberia Surface Based W/S Scheme under Amdanga block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte. for 365 days.
Oeration maintenance of distribution system and rising main (CI/DI/AC/UPVC pipe) of Algoria Surface Based W/S Scheme under Barasat-I block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte. for 365 days.
Day to day Operation and Maintenance of Rising (pumping) main of North 24 Pgs. Arsenic Area Water Supply Scheme under North 24 Pgs Water Supply Division-I, P.H.E. Dte for 365 days.
Day to day Operation maintenance of distribution system (CI/DI/AC/UPVC pipe) of Khejurdanga Keyadanga Surface Based W/S Scheme under Deganga block within the jurisdiction of North 24 Pgs W/S Division I, P.H.E. Dte.for 365 days.
Shifting and laying of UPVC pipeline at damage portion and allied restoration of road under Beraberia (Zone- VI-A) W/S Scheme under Amdanga block within the jurisdiction of North 24 Parganas District under N24Pgs. W/S Division-I, P.H.E. Dte.