Loading…
Loading…
579 results • Latest
Construction of protection wall at downstream side of Harvalem Bandhara at Moksha Dham of Rudreshwar temple at Harvalem village of Sankhalim Constituency.
Improvement to the agriculture drain in the paddy field known as kass situated at Tarwada in Pilgao village of Bicholim Taluka.
Construction of Flood Protection Wall from behind of Shree Bhutnath Temple to the house of Shri. VasudevSawant, Sawantwada, Amona, Sankhali in V.P. Amona in Sankhali Constituency of BicholimTaluka
Stabilization of hillslope by Construction of Protection wall behind the house of Mr. Pravin Redkar and others at Dmello waddo of V.P. Verla Canca in Siolim Constituency.
Improvement and Cleaning of various ponds and tanks in Aldona Constituency.
Installation of Fire Hydrant and Fire Alarm system for Multi-purpose Cyclone Shelter (MPCS) at Aquem Margao Salcete Goa.
Improvement of existing nallah behind hotel Ginger Malbhat in Margao Assembly constituency.
Improvement/Repairs to existing nallah at Kharebandh and Malbhat area in Margao Assembly Constituency.
Stabilization to the unstable hill slope for the hill to protect soil erosion at Talwate Tallyewada in Village Betoda of Shiroda Constituency.
Construction of protection wall to the side banks of nallah at Talwate-Tallyewada in V.P. Betoda, Nirankal, Conxem, Codar of Shiroda Constituency.
Stabilization to the unstable hill slope to prevent soil erosion near Shree Paikdev temple at Digas Panchawadi in Shiroda Constituency.
Improvement to various existing nallahs in V.P. Ucassaim Paliem Punola in ward No. 1, 2, 3, 4, 5, 6 and 7 and V.P. Bastora in ward No. 1, 2 and 3 in Aldona Constituency
Improvement to existing various nallahs in V.P. Pomburpa-Olaulim in ward No. 2, 3 and 5 and V.P. Aldona in Corjuem, Carona and Quitla in Aldona Constituency
Improvement and repairs to the existing field channels at Nanachepani at Village Panchayat Warkhand Nagzar in Pernem Taluka
Fifth Revised Estimate of the interstate Tillari Irrigation Project canal network in Goa Reg Improvement to B 6 distributary of RBMC of TIP from Ch 3 360 Kms to Ch 4 460 Kms by providing Ductile Iron pipeline in Village Torxem in Pernem taluka
Improvement and Development of nallah near Sainiket Power Cleaners factory at Makadsai in V.P. Shiroda of Shiroda Constituency
Improvement of nallah from footsal behind Navjeevan hospital to Curti Panchayat road/ Improvement of tali and nallah near Shahi Madina Masjid Haveli Curti and const of steps for Ganapati visarjan at Bhatan and Bhave s house VP Curti in Ponda taluka
Flood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near Shree Devi Temple Shiroli Keri in Poriem Constituency
Improvement of nallah by construction protection wall near the field of Smt. Laxmi Apa Chorlekar bearing Sy. No. 11/4 at Village Naneli in Poriem Constituency V.P. Dongurli Thane in Sattari Taluka.
Improvement of existing tali of Pisadev Devasthan at Village Pissurlem V.P. Pissurlem in Poriem Constituency in Sattari Taluka.
Prevention of salinity intrusion into the cultivable land bearing Sy. No. 183, 184, 185 and 186 by improvement to existing nallah and field channel and desilting of water bodies in Sy. No. 182/1 and 182/2 at Quelossim in Cortalim Constituency.
Direct Request for Proposal For Consultancy services for Third Party Quality Assurance and Quality Audit of Works under Bihar Water Security and Irrigation Modernization Project (BWSIMP)
Supplying Installation of Automation system for Auto operation of Sluice valves for existing pumps located at LI scheme III at chainage 17 240km at Nagzar in Pernem Taluka 2nd call
Revised Estimate for Command Area Development and Water Management Programme of Tillari Irrigation Project Urgent Repairs and Maintenance to the lift irrigation scheme No I III at village Kasarvornem and Nagzer in Pernem for the year 2026 27 2nd call
Construction of protection wall near Custodio Borges House in Marlem Borda in Fatorda Constituency.
Construction of Seepage Water Recovery and Pumping Scheme for Salaulim Dam Main Canal Augmentation at Xelpem village, Sanguem Taluka
Improvement of nallah, Construction of Ganesh Visarjan Steps and Side Protection wall near Laxmi Narayan Temple at Benduxem Dongrim in V.P. Navelim, Navelim Constituency of Salcete Taluka.
Improvement to the existing retaining wall along the nallah near Luis Caetan Dias house at Agalli in Fatorda Constituency.
Improvement to the nallah and protection to the fields in Chalta No. 9 P.T. Sheet no. 95 at Borda in Fatorda Constituency.
Improvement and protection to the nallah in Chalta No. 38, P.T. Sheet No. 137 near Junta Quarters, Bhutebhat in Vasco Constituency.
Improvement and renovation to the existing tali of Sattari Devasthan at Ravana in V.P. Kerim in Sattari Taluka
Urgent repairs to the existing earthen bund of Karekhajjen Virdi Sankhali in Bicholim Taluka of Sankhali Constituency
Reconstruction of existing culvert in Sy. No. 425/12, 435/11, 525 in Calapor village of St. Cruz Constituency.
Improvement and repairs to Ganesh Visarjan platform near Four Pillars, Mansher, Ward No. 20 at Mala in Panaji Constituency.
Improvement to the waterways by construction of protection wall to the eroded bank of nallah in Survey No. 89/2 of Shiroli Village in V.P. Querim of Sattari Taluka.
Replacement of damaged Sluice Valve at Vizar band-Aad field in V.P. Panchawadi of Shiroda Constituency
Improvement to Katcha Canal at yetal field (Naikatod) in V.P. Shiroda of Shiroda Constituency
Construction of retaining wall from Dream Hall upto Zariwado in Sy. No. 34/2 at Mullem in Cuncolim Constituency.
Improvement to the nallah and stabilization of nallah side bank near Shantadurga Temple from Karapurkar house to Hazare house in sy. no. 43/1 at Shantinagar in V.P. Aquem Baixo in Navelim Constituency
Extension by incorporating Piped irrigation system for of DWC 9 off taking from Ch 9 18 km of B 2 distributory of RBMC of TIP in Village Allarna of Pernem Taluka
Repairs to the existing Ganapati Visarjan Platform at Gawandiwada Talarna in ward no VII VP Alorna in Pernem Constituency
Improvement and closure to breaches to the existing bund at Mardiwada at Devsu Corgao in ward no 3 in Pernem Constituency
Providing and fixing of Sluice valve and repairs to Pagartollem Irrigation tank at Tarvalem in V.P. Shiorda of Taluka Ponda
Construction of nallah crossing in Sy. No. 12/0 Anjuna in V.P. Anjuna Caisua in Siolim Constituency. (IInd Call)
Improvement to various existing nallahs in V.P. Anjuna-Caisua in Siolim Constituency. (IInd Call)
Beautification to the existing Ganesh Visarjan Platform/flood control measures at Bandir waddo in ward No. III, Chapora in V.P. Anjuna-Caisua in Siolim Constituency.
Improvement of nallah by constructing protection wall near the field of Shri Demgo Vithu Khot bearing Sy. No. 9/10 at Golali village in Poriem Constituency in Sattari Taluka.
Improvement to waterway of nallah by constructing protection wall near Sy. No. 17/15 at Devachi Rai at Shingnem V.P. Nagargao in Sattari Taluka.
Construction of Side Protection wall for nalla from the house of Shri Santosh Gaonkar, Viarjan Platform at Paltawada Maulinguem in Mayem Constituency.
Strengthening and relining of Paroda Canal and replacing of Old Pipelines from Chainage 0.00 to 16.72 km from Quepem to Macazana Village, Salcete Taluka.