Loading…
Loading…
Found 5 active tenders
5 results • Latest
Development of nallah in Survey No.18/5-A, 18/5-B, 18/5-C, 18/5-D, 18/5-E and 18/5-F at Punola ward No.3, Ucassaim, V.P. Ucassaim Bardez in Aldona Constituency. (Re-tender)
Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt clay, gravel, moorum of all verieties shingles, pebbles, all types of conglomarets, laterite rock, soft rock, disintegrated or weathered rock, fissured shattered, decomposed rock, and such materials either in full or parts,as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/ dewatering including setting out constructed of shoring and bracing, removel of stump and other deleterious matter, dressing of sides and bottom back filling the excavated earth to the extend required and dispesing of the surplus excavated earth/rock including all leads and lifts etc as per specification and drawing and directed by Engineer -in-Charge : All kinds of soil.
Construction of minor irrigation tank at Charavnem in V.P. Dongurli Thane in Sattari Taluka. Reg. Study on Disaster Management plan and waste Management plan
Scope of Work for Preparation of Disaster Management Plan Preparation of Disaster Management Plan Preparation of Disaster Management Plan, Preparation of the DMP as per standard guidelines (e.g., NDMA Guidelines for Disaster Management of M.I. tank, BIS codes, etc.) including Pre-Disaster Phase: Early warning systems, Communication protocols, Preparedness and training activities, Community awareness plans. During Disaster Phase Emergency response actions, Evacuation plans and route mapping Roles and responsibilities of stakeholders, Activation of Emergency, Operation Centers (EOCs), Post-Disaster Phase: Damage assessment, Relief and rehabilitation measures, Restoration of services, Post-incident review, Define roles and responsibilities of M.I. tank authorities o State/District Disaster Management Authorities, Local administration o Emergency services (Police, Fire, Health, etc.), Development of a command structure and coordination mechanism, Capacity Building and Training Design and deliver training modules for M.I. tank staff and local emergency responders, Conduct mock drills and simulation exercises, Prepare Standard Operating Procedures (SOPs), Community Awareness and Public Participation, Community risk communication strategies, Public information dissemination plans, Coordination with local NGOs and civil society organizations, Documentation and Reporting, Draft and final Disaster Management Plan document, Maps, charts, SOPs, contact directories, etc., Submission of soft and hard copies in required formats and as directed by Engineer in Charge complete
Construction of retaining wall from Tonca bridge to Chowdar, Tonca Waddo at V.P. St. Estevam in Cumbharjua Constituency.(Re-tender)
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil
Strengthening of bund in Sy. No. 170, 172 and 173 at Navelim Diwar in Tiswadi Taluka.(Re-tender)
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the material such as soil, silt, sand, clay, gravel moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shattered rock, decomposed or weathered rock and such other materials in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom providing barricading, danger lighting , guarding etc & back filling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and lifts etc. as per specification & drawing and directed by the Engineer-in-charge etc complete.
Engineering, Procurement and Construction (EPC) Contract for Package III (SH Development of Waterbody, Beautification, Protection Works and allied associated works.)
Design and installation of protection work around waterbody area.