Loading…
Loading…
6,451 results • Latest
M and R to K.T.Weir at Tambad Kolawade, Jambhali, Didghar, Mohari, Umbre, Nigade and Malegaon Tal- Bhor on Gunjawani and Shivganga River for the year 2026-27 (Removing and Plugging Needles Work)
URGENT REPAIR WATCH AND WARD AND OILING GREASING OF ALL DAMS UNDER JURISDICTION OF WATER RESOURCES SUBDIVISION DUDU.(2026-2027)
Providing and laying 24mm dia wire rope 6x36 fiber core including applying of Cardium compound winding on drums to lift 40t spillway gate no 2 4 6 of Opa barrage at Opa Khandepar in Ponda Taluka.
Urgent repair and watch and ward of feeder andbund in Sanganer section for Rainy season 2026-2027.
Providing and laying 24mm dia wire rope 6x36 fiber core including applying of Cardium compound winding on drums to lift 40t spillway gate no 1 3 5 of Opa barrage at Opa Khandepar in Ponda Taluka.
CONSTRUCTION OF GRADED BUNDING AT. DAUDGAON. GAT NO. GP55/2/5/2.
Flood prevention, protection and strengthening of banks of ghaggar river nali bed during flood period of the year 2026-27 Pilibanga sub division
CONSTRUCTION OF GRADED BUNDING AT. RAMESHWAR. GAT NO. GP55/2/5/1
Flood prevention, protection and strengthening of banks of ghaggar river nali bed during flood period of the year 2026-27 khara sub division
For Flood control Maintenance work of Bichi stop dam, Shringheshwar stop dam, Sad stop dam and canal of Sunaj Tank.