Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
383 live228 closing this weekmost from Water Resources Department and Engineer-in-Chief - Water Resources Department
383 results • Latest
"CONSTRUCTION OF FLEXIBLE PEVEMENTROAD ON NIRMALI GHOGHARDIHA LINK ROAD FROM KM 0.00 TO KM 3.09 UNDER WESTERN EMBANKMENT DIVISION NIRMALI, SUPAUL"
Construction of PCC Road from H/O Laleswar Mahto to Devi Mandap in Tarwan, Village- Tarwan, GP-Kichto, Block-Tandwa, Dist.-Chatra. (Gr. No- 2)
Construction of PCC Road from Chorbora Chowk to Bichi Tongari Primary School Village-Kashiyatu, GP-Kasari, Block-Simaria, Dist.-Chatra. (Gr. No- 1)
Dam Rehabilitation and Improvement of Rupaniyakhal Tank.
Selection of Irrigation Service Provider (ISP) for the development of Pressurized Piped Irrigation Network (PPIN) and provision of irrigation services in Lyngkhoi FIP Cluster, Meghalaya under Modernization of Command Area Development (M-CADWM) scheme
Supply and Installation of Porcupines in four subproject areas (Dhemaji and Lakhimpur, Jorhat, Goalpara and Morigaon) Lot 2
Supply and Installation of Porcupines in four subproject areas (Dhemaji and Lakhimpur, Jorhat, Goalpara and Morigaon), Lot 1
Carrying out Water Rotation by external agency (including necessary equipments), Measurement of Irrigated area, Preparing Akarani Patrak, Preparing and distributing Water Bills to farmers and Providing Labour for recovery of water charges by formatio
Carrying out Water Rotation by external agency (including necessary equipments), Measurement of Irrigated area, Preparing Akarani Patrak, Preparing and distributing Water Bills to farmers and Providing Labour for recovery of water charges by formatio
Providing Stationary material of Gohad division
Repairing work of D50 A15 No.34 and D50 A15 No.92
Supply of Spare parts for D50 A15 No. 34 and D50 A15 No. 92
Repairing work of CT 85 No.04 and CT 85 No.07
Supply of Spare parts for CT 85 No. 04 and CT 85 No. 07
Purchase of New Ph electrode for the bench top multi meter in the Geochemical Sub Division, Madurai-2 during the year 2026-2027
Installation of fencing arrangement and Name board for Relocation of Standard Raingauge Instrument at Kancherampettai Tank area in Periyapatti Village in Madurai District
Repairing work of CT 85 No.11 and D50 A15 No.35
Supply of Spare parts for CT 85 No. 11 and D50 A15 No. 35
Upper manar lift irrigation scheme sangvi tq.ahmedpur dist.latur Operation and watch of canal head regulator of d box dol and minors in rotation period and measuring area irrigated year 2026-2027
Construction of Concrete Pedestal and Platform for Relocation of Standard Raingauge Instrument at Kancherampettai Tank area in Periyapatti Village in Madurai District
Construction of Appraoch Road crossing to Canal at RD 3400 m, 23890 m, 38130 m, 40790 m and 42070 m of Ghodazari Branch Canal.
PROVIDING AND FIXING KERBS ALONG THE INTERNAL ROAD AND LAYING PAVER BLOCKS ADJACENT TO THE KERBS AT UJJANI COLONY, MANGALWEDHA
Upper Manar Lift Irrigation Scheme sangvi Tq. Ahmedpur Dist.Latur Providing Security Services to Pumphouse and its Premises 2026-27
Special Repair work of Re-construction for C.D. at ch. 5.50 of Lahmara minor of Jamuniya tank
Construction of HR on Galcha Minor, Wing wall of HR of Bhokhedi Minor and damage lining of PBC Canal
RECONSTRUCTION OF 1.20M FALL AT CH 269 OF MANGOLIKALAN DISTRIBUTORY AND 1.00M FALL AT CH 10 OF MOUDA MINOR OFFTAKING FROM CH. 208 MONGOLIKALA DISTROBUTARY OF DHUTY L.B.C. SYSTEM
Repair work of canal gates of Mahi Project Right bank canal under Water Resource Division Jhabua.
Repair and renovation work of guest house building pachmari
Disposel Unserviceable material from the store Machha Distribution Sub Division
Repair and Servicing work of Beddha minor Tank under Water Resources Sub Division Rajpur WR Division Barawani.
Providing, fabrication, supply and erection work of leaf assembly of gate size 1.40m x 1.40m - 11nos for Brahmangaon Barrage.
Renovation and maintenance of Division office Khaniyadhana.
Repair work of 30 nos. cross regulator and head regulator gates of main canal of Sukta Dam under sub division no.05 Pandhana under Water Resource Division Khandwa.
Repair and maintenance of Rest House Rajghat colony Khaniyadhana.
Construction of new 11 kv line and dismantling of existing 11 kv and LT lines submerged by Pangri Irrgigation Project at village Pangri under Khaknar D/C of Water Resource Division Burhanpur.
Construction of new 11 kv line and dismantling of existing 11 kv, LT lines and DTR submerged by Pangri Irrgigation Project at village Pangri under Doifodia D/C of Water Resource Division Burhanpur.
Repair Work For 16 Nos. Canal Gates installed at the Pawai Medium Irrigation Project Distt Panna (M.P.)
ANNUAL REPAIR OF RICHHAI TANK CANAL
On percentage basis supply of labour for watch and ward maintenance of Sub Division Division Circle Chief Engineer Offices at Indore
Repair Work For 15 Nos. Canal Gates installed at the Urmil Irrigation Project Distt Chhatarpur (M.P.)
Repair Work For 06 Nos. Canal Gates installed at the Umehi Nala Tank Distt Panna (M.P.)
Repair Work For 18 Nos. Canal Gates installed at the Runguwan Irrigation Project Distt Chhatarpur (M.P.)
Shiffting of 11KV Line (Baroda Feeder)affected by submergence of Baroda Dam Irrigation Project Distt Sagar (M.P.)
Repair work of canal gates of Mahi Project Left bank canal under Water Resource Division Jhabua.
Repair Work For 10 Nos. Canal Gates installed at the Bariyarpur Left Bank Canal Irrigation Project Distt Chhatarpur (M.P.)
Procurement of MS Round Bar of 63 mm diameter and 56 mm diameter for fabrication of gates of various W.R. Divisions.
Construction of Additional Structures ,Widening of Service Road ,Earthwork and Murum filling at selected places and Lining work at RD 0 To 4120 m on Right Distributary of Lal Nala LIS.
Detailed Construction Planning and Designing for Pipe Distribution Network System, Alignment Survey for Main lateral Sub main, Chak Planning, Structures, Taking Trial Bores Trial Pits and Preparation of Estimates of Remaining command Area of Ajans
Construction of Balance Work of Sonegaon Minor of Loharisawanga Distributory, Kar River Project Karanja (Gh
Repair of Slab Culvert at RD 2640 on RBC of Sukali Tank Project