Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
383 live228 closing this weekmost from Water Resources Department and Engineer-in-Chief - Water Resources Department
383 results • Latest
Construction of Selective Lining on Right Bank and Left Bank Main Canal of Sukali Tank Project
Installation of solar power system in departmental office premises, including ground levelling and other allied civil works
Construction Of Repair Work at Slab Culvert Rd - 11445 Mtr On the RBC Under Sukali M.I.Tank.
Construction of inlet at R.D. 600 of Main canal,HR on Khapri minor-2, VRB on Sawardoh minor and Repair of Structures and Miscellaneous works on Jatlapur Distriburory
Appointment of Architect cum Project Management Consultant for Construction of Administrative Building for Water Resources Department at WID Premises , Wardha
Construction of Additional Structures on Left Minor offtaking at RD 420 m on Right Distributary of Lal Nala LIS.
Repair of HR at Lohari Sawga distributary and Construction Of Protection wall at Box Culvert 13050 m Under Kar River Project.
Epoxy Grouting of Aqueduct and Construction Trough at Tonglapur distributory offtaking at 16.66 KM Main canal of Kar River Project Karanja
Replacement of Needle of Kholgadga K T Weir
Maintaining the LBP main canal and its distributories from mile 35/0 to 39/0 for the year 2026-2027.
Maintaining the Mettupalayam Distributory and its Branches for the year 2026-27 .
Improvements to water bodies, Supply Channels and its components in Madurai and Sivagangai Districts relating to the expansion of Madurai International Airport in Madurai District by Water Resources Department for Vaippar Basin Circle, Virudhunagar.
CONSTRUCTION OF P.C.C. ROAD FROM YUSUF HOUSE TO CHAKTAND VIA MILLAT PUBLIC SCHOOL IN BHUIYADIH PANCHAYAT BHUIYA CHITRO BLOCK- TOPCHANCHI DIST- DHANBAD
RENOVATION OF COMMUNITY HEALTH CENTRE BAGHMARA DIST- DHANBAD
CONSTRUCTION OF P.C.C. ROAD FROM KALI MANDIR TO SINGH TOLA BINOD MAHTO AND BANTOL ROAD TO ADIWASHI TOLA, PANCHAYAT- MARICHO BLOCK- GOVINDPUR, DIST- DHANBAD
CONSTRUCTION OF P.C.C. ROAD FROM MATARI RAJWAR TOLA BARGAD PED SE MANDALTOLA HOTE HUYE RANGADIH PANCHAYAT MATARI BLOCK- TOPCHANCHI DIST- DHANBAD
CONSTRUCTION OF 1910.0M P.C.C. ROAD FROM BELGADIYA TO TOWARDS VIJAYDIH UNDER PANCHAYAT PALANI, BLOCK- BALIYAPUR, DIST- DHANBAD
RENOVATION OF COMMUNITY HEALTH CENTRE TOPCHANCHI DIST- DHANBAD
CONSTRUCTION OF P.C.C. ROAD FROM MAHTO TOLA TO NUTUNDIH MUSLIM TOLA VIA HIRAK ROAD IN KUNJI PANCHAYAT TELMOCHO BLOCK- BAGHMARA DIST- DHANBAD
Facility Management Services - LumpSum Based - Office of the Executive Engineer, KNNL, GRBCC Div No 3 Gokak; 1 Group d from 1st Nov to 31st March 27 to Office of the Executive Engineer KNNLGokak and 1 DEO and 1 Group D and 1 Driver to Office of the S..
High Mast Lighting Octagonal Towerfor Smallareawith LED Flood Lighting System (V2) (Q2)
Supply of Geo-textile Tubes for 21km of embankment in Dhemaji and Lakhimpur Subproject (Dhemaji District) and Morigaon subproject (Biswanath District)
BEAUTIFICATION WORK OF PARRI TALAB PUSSOUR
Hiring of Mahinfra Bolero Touring Vehicle for for Govt. Work Under Light Machinery and E/M. Division Narmadapuram ( for 12 Months) (Second Call)
Repalcement of rubber seal of 8 No radial crest gate Chandora Medium irrigation Project in WRD Sub-Division Prabhat Pattan under Division Multai
Improvements to Water bodies, Supply Channels and its components in Madurai and Sivagangai Districts relating to the expansion of Madurai International Airport in Madurai District by Water Resources Department.
Construction of the Compound Wall Outside the Pumphouse of Lower Chulband Project, Ta. Sakoli, Dist. Bhandara.
Repairs To Canal Gates By Dismantling Old Worn Out Gates, Manufacturing, Erection And Testing Of Outlet Gate Sliding Type Under Baramati Irrigation Subdivision, Baramati Repairs To Escape Gate 1.2 m X 1.2 Mtr - 7 Nos. With Embedment And Hoist
Construction of Cement Concrete Approach Road and Internal Road of Pump House under Lower Chulband Project, Ta. Sakoli, Dist. Bhandara.
REPAIR OF LOYADIH AAM VILL/PANCHAYAT- LOYADIH BLOCK-DHANBAD DIST -DHANBAD
REPAIR OF KOLAKUSMA AAM VILL/PANCHAYAT- KOLAKUSMA,BLOCK-DHANBAD, DIST -DHANBAD
Facility Management Services - LumpSum Based - Office of the Executive Engineer KNNL IPC Divison No 1 Kalaburagi; Service provider required to quote the rates for Computer Operator 07 Nos and Driver 01 Nos and for a period of 1st April 2026 to 31st ..
STRENGTHENING OF PONDI TANK SCHEME UNDER MASTURI IN BILASPUR DISTRICT.
REPAIR AND RENOVATION WORK OF C.C. LINING OF DEVGAON DISTRIBUTORY UNDER LEFT BANK CANAL.AND CONSTRUCTION OF PROTECTION WALL FROM R.D. 2150 M. TO 3300 M. OF MAIN CANAL OF KHARUNG TANK SCHEME.
REPAIR AND RENOVATION WORK OF C.C.LINING OF KHARUNG LEFT BANK CANAL FROM R.D.49500 M. TO 51000 M., R.D.54300 M. TO 56190 M. & CONSTRUCTION OF V.R.B. AT R.D.810 M.OF JUNWANI MINOR CANAL.
REPAIR & RENOVATION WORK OF C.C.LINING AND STRUCTURES UNDER CHILHATI DISTRIBUTORY OF KHARUNG TANK SCHEME.
UPGRADATION OF BILASPUR TRAINING CENTRE IN BILASPUR.
Construction of 50 m Anicut along with an afflux bund 240 m on left and 680 m on right side of U/S & D/S of Anicut CC block on top & slope of bund on Hamp river in village Chhirha Block Bemetara District. Bemetara
Construction of Kotra Minor from RD 0 to 1920 m, Udaipur Minor from RD 0 to 1770 m, Purena Minor from RD 0 to 1230 m, Kotrichaper Minor from RD 0 to 1290 m, Khairi Minor from RD 0 to 1320 m, Manhar Minor from RD 0 to 1500 m, Sitadabri Minor from RD 0 to 960 m, Ghirgholi Minor from RD 0 to 1230 m, Gabhra Minor from RD 0 to 2340 m with construction of 20 Nos. VRB, 15 Nos. Fall, 04 Nos. Minor Head, 1 No. Head Sluice, Gabhra Minor R.C.C. Open Trough From RD 0 to 750 m and fixing of colaba pipe of Siddhbaba Tank Scheme in Block - Chhuikhadan of District - Khairagarh-Chhuikhadan-Gandai
Renovation of head work, repair of head sluice, waste weir C.C. lining of main canal RD 0 m to 1800 m, Construction of 04 Nos V.R.B. and repair of old structures of Birjhutola Tank Scheme under Block Mohla of District Mohla-Manpur-A. chowki
Manufacturing and fabrication of sliding type gate 0.6 X 0.6 mtr 02 nos and 0.9 x 0.9 mtr 04 nos for Isapur right Bank Canal Dist.Nanded
Estimation of water availability and its Demand for State of Goa upto 2037-Reg.
Stabilization to the LHS bank of nallah on the downstream side of Raichemol bandhara at Raichemol Panchawadi in Shiroda Constituency.
Improvement to breached bund on LHS of nallah and Construction of waterway at Kajarwada in Village Betoda of Shiroda Constituency
Supply, Install and Commissioning of Five Floating Fountains with Integrated Aeration System, RGB led light and Mechanical work at Navdurga temple tank (Lake) in V.P. Borim in Shiroda Constituency of Ponda Taluka.
Strengthening of wall to arrest soil erosion at Kople fields in Village Borim of Shiroda Constituency
Special Repairs to Gents and Ladies Toilet rooms of Lower Vaigai basin circle office in Sivagangai Taluk of Sivagangai District