Loading…
Loading…
5,556 results • Latest
Construction of retaining wall on upstream side of Dhulpe Bandhara in ward No. 02 in village Shiroda of Shiroda Constituency
Improvement to the bank of nallah at Kudyal Borim in Shiroda Constituency of Ponda Taluka.
01/WRD/WWDNO1/CKP/F2-01/25-26 (2ND CALL) Dismantling of Old Pipe Culvert at km. 3.1 and Construction of New SLR Bridge at km. 3.2 of Sonua Main Canal Under Sonua weir irrigation scheme.
Improvement to nallah/waterway from Shree Siddeshwar temple to the fields from Ch. 1.50 km to Ch.3.00 km at Paliem in V.P. Ucassaim Paliem Punola in Aldona Constituency.
Construction Of Cross Regulator Cum Escape and Feeder Canals To Fill the Completed Storage Tanks On Canals Of Stage No. 1 To 5 Of Lift Irrigation Scheme No.2 under Krishna Marathwada Irrigation Project Dist. Dharashiv
Computation of HFL and Hydraulic Study of Aasana River with detailed block contour survey and Demarcation of Red line and Blue line in Hingoli and Nanded District
Repairs and Maintenance to Verticle Lift Gate of size 12x7mtr -02 Nos by replacing old and damaged parts of Track rollers by overhauling of Track rollers at Wanjarkheda Barrage on Manjara River (Second Call)
Repairs and Maintenance to Verticle Lift Gate of size 12x7mtr -02 Nos by replacing old and damaged parts of Track rollers by overhauling of Track rollers at Khulgapur Barrage on Manjara River (Second Call)
Repairs and Maintenance to Verticle Lift Gate of size 12x6.5mtr -02 Nos by replacing old and damaged parts of Track rollers by overhaulling of Track rollers at Shivani Barrage on Manjara River (Second Call)
Repairs and Maintenance to Verticle Lift Gate of size 15x7mtr -02 Nos by replacing old and damaged parts of Track rollers by overhauling of Track rollers at Dongargaon Barrage on Manjara River (Second Call)