Loading…
Loading…
2,614 results • Recent activity
Structural strengthening and renovation of Clear Water Pumping Station Phase-I, GRWW.
SUPPLY DELIVERY AND FITTING FIXING OF CHLORINE GAS INLET CS PIPE LINE AND CHLORINATED WATER OUTLET UPVC PIPE LINE FOR NEWLY INSTALLED 60KG/HR. CHLORINATOR SET WITH OTHER ANCILLARY WORK AT CHEMICAL HOUSE OF WTP-IV, GRWW.
MAINTENANCE OF THE SHIB MANDIR SIDE 4-STORIED LABOUR QUARTER PREMISES AND DRAIN WITH PITS BY REMOVAL OF JUNGLE/SCUM ETC AT IGWTP.
RESTORATION OF W.S NETWORKS BY LEAK REPAIR VALVE REPAIR CUTTING AND FLUSHING CONSTRUCTION OF SV CHAMBER ETC AT DIFF. BYE LANE OF BAGHAJATIN BLOCK C, D BAHADUR MAATH AND SURROUNDING AREA IN WD NO 102 BR XII.
Structural strengthening and renovation of WTP-I GRWW.
REPAIRING OF THE C-TYPE QUARTER NO C/13 AND C/14(INSIDE PORTION) AT IGWTP