Loading…
Loading…
2,614 results • Recent activity
ENHANCEMENT OF THE SEPTIC TANK AND PLINTH PROTECTION OF THE TWO STORIED LABOUR QTR BLOCK-1 AT IGWTP.
RESTORATION OF THE COLLAPSED BOUNDARY WALL WITH ADJOINING PASSAGE TOWARDS THE HUT QTR NO- H/150 NEAR MESS BUILDING AT IGWTP
Name of work REFURBISHING OF THE BATHROOM, KITCHEN WITH DAMPED FLOOR/CEILING AND DAMAGED PARTS OF WOODEN DOORS/WINDOWS OF THE D-TYPE 4TH STORIED LABOUR QTR NO- D/21,D/23,D/28 AT IGWTP.
RECONDITIONING OF THE WORN OUT COAGULANT LIFTING PUMPS AND ITS PIPING NETWORK COMPONENTS AT 100MGD CLARIFIER PLANT AND NATURAL SEDIMENTATION PLANT, UNDER IGWTP.
REPAIRING OF THE BEDROOM,BATHROO M AND KITCHEN WITH DISPLACED DOORS/WINDOWS, PEEL-OUT PLASTER ETC OF THE D1-TYPE (2ND STORIED) LABOUR QTR NO- D1/17,D1/20,D1/21 AT IGWTP.
INSTALLATION, TESTING AND COMMISSIONING OF THE HIGH VOLTAGE CAPACITOR BANK ACROSS THE HT MOTORS AT INTAKE STATION NO 1, IGWTP.