Loading…
Loading…
2,243 results • Latest
Renovation of WHS, MPT and Bank stabilization work of IWMP 9 Project area P S Dholpur
HIRING OF OFFICE VEHICLE
CONSTRUCTION OF FARM POND AND CCT AT P.S. KOTRI
Construction of PT/MWP Renovation in MWP project area Block Bhinai Distt Ajmer
Pasture Development work in Nadol, PS Desuri, Pali
Water Shed Works
Water shed works
Roof Top Rain Water Harvesting Structure Block Tinwari
Water Shed Works
Construction of Vermi Compost under PMKSY 2.0 in Block Sarwar Distt. Ajmer
Construction of Manger under PMKSY 2.0 in Block Sarwar Distt. Ajmer
Contruction of PT/MWP in MWP Project are Block Sarwar Distt. Ajmer
Hiring computer operator
Construction of Anicut Nirman Karya (1), Safety wall (3),ECD (2), MPT(1), Bawadi(1) in GP- Sawanbhado/Mamor/ Hingonia at P.S. Sangod in MJSA 2.2 Project Area (State Fund)
Construction of NRM works under MJSA 2.2 Farm Pond(9 no.), Nala Deepening(7 no.), Recharging shaft fo aquifers(4 no.), RTWHS(5 no.), Sunken Pond(1 no.) G.P: Gandiphali, Jakhoda, Godliyahedi, Arandkhera, in P.S:- Ladpura
Construction of various watershed development structures in MJSA 2.3 Block Bhaniyana
NIT11/2026-27/JAWAJA(MJSA 2.2)
Construction of Renovation of Check Wall Talai 1, Anicut Renovation under WDC-PMKSY 1.0 (IWMP-II) in Project Area Panchayat Samiti Talera
Construction of various water harvesting structures Under MJSA 2.0 PHASE II PS BARMER Distt Barmer
watershed development works Tanka 30 cum(40 Nos) total
watershed development works Tanka 50cum(01Nos),Tank 30cum(10Nos) total 11 works
Display Board no. 14, (Masonary Work) at Road Side under PMKSY-2.0 area, Block Nechhwa
Display Board no. 14, (Masonary Work) at Road Side under PMKSY-2.0 area, Block Dhod
ब्रिक्स बोर्ड निर्माण कार्य दिवार पैटिंग एंव नारा लेखन कार्य ग्राम पंचायत पोहड़का एंव रामपुरामटोरिया
Pakka Work- Anicut, Pakka Check Dam and anicut cum causway Total 22 works
Display Board no.-12 at road side under PMKSY-2.0 block-Dantaramgarh
Construction of various Water Harvesting Structures under MJSA 2.0 PHASE III PS Sheo District Barmer
Construction of RTWHS 29 No under MJSA-2.0 IInd phase
RENOVATIO N OF TANKA UNDER MISSION WATERSHE D PUNRUTHA N( MWP) IN BLOCK -PHALODI
Distributionof Carry Bag Buhana
Distributionof Carry Bag Mandawa
Distributionof Carry Bag Chirawa
Construction of Water Harvesting Structureond MJSA 2.0 Phase III in Panchayat Samiti- Talera
Renovation of various Watershed development structures under MWP in Block AAU
Renovation of various Watershed development structures under MWP in Block AAU
Supply and arrangement of Food and breakfast
Arrangement of BUS vehicle
Renovation of PCd work in MWP, Bhatund, PS Bhatund
Renovation of MPT and Sunken pond work MWP, Netra and Annopura, PS Sumerpur
Renovation of Anicut, PCD and MWP works Bera, PS Bali
Supply and Fixing of Sprinkler Set no. 108 in PMKSY 2.0 Project Area in Nechhwa
Construction of 18 fram pond with HDPE sheet,1 SSB with LDPE sheet Total 19 works
contruction of 20 Farm pond with HDPE sheet,5 sunken pond total 25 works under MJSA-2-0 Phase-III,PS-Madhorajpura,jaipur
Construction of RTWHS 68 No and Recharge Saft No. 01 and Talab Renovation work No. 1, under PMKSY 2.0 Project Area, AEn WDSC Block - Nechhwa, Sikar
Construction of RTWHS 59 No and Farm Pond No. 01, under PMKSY 2.0 Project Area, XEn WDSC Block - Dhod, Sikar
construction of 24 Farm pond with HDPE sheet total 24 works under MJSA-2-0 phase-II,PS-Chaksu,Jaipur
Construction of 44 Farm pond (With HDPE Sheet) in Arable Land, and 01 Sunkan Pond Total 45 Works MJSA-2.0 II Phase PS- Mozmabad Jaipur
Construction of 50 Farm pond (With HDPE Sheet) in Arable Land MJSA-2.0 II Phase PS- Mozmabad Jaipur
Construction of 51 Farm pond (With HDPE Sheet) in Arable Land and 01 Talab renovation MJSA-2.0 III Phase PS- Mozmabad Jaipur
Construction of 44 Farm pond (With HDPE Sheet) in Arable Land, 05 Sunkan Pond and 01 Talab renoation Total 50 Works MJSA-2.0 II Phase PS- Mozmabad Jaipur