Loading
Loading…
Loading…
2 live1 closing this weekmost from Watershed Development and Soil Conservation
2 results • Latest
Retaining wall cumbuilt rectangular spillway(2)50Mtr,River bank PT wall cum check dam(6)50Mtr, Retaining wall cum curved spillway(3)50Mtr,Step gabion river bank protection wall(3)50Mtr,CC spilway/Drop structure(3),Step gabion Spur (12) 30Mtr baran
Construction of Tanka and Farmpond PS Kheevsar Pac 01/2026-27/MJSA-2.2/WDSC/Kheevsar