Loading…
Loading…
4,620 results • Latest
Construction of road from Painta bajar to tirol within Raina-I Block, Length-4.100 Km
T10 Bhula to Paiharmora within Sonamukhi Block (Road Length 14.105 Km)
Construction of RCC Box culvert 1cell 4mX4m X6m at Bauria Shibtala with allied works at Ch. 600m at Hatgacha-II GP under Uluberia-I block in the district of Howrah.
Permanent Restoration of road Dub Khanpora, Package No JK13-80.
Permanent Restoration of road L032-L072 to Kielthulla, Package No JK13-123.
Permanent Restoration of road Nagbal to Dardkhawer, Package No JK13-76.
Permanent Restoration of Road from Manzmooh Bakerwal Chek Package No Jk01-212
Permanent Restoration of road NHW to Malshahibagh, Package No JK13-72.
Construction and Maintenance of Road L039-(Link Road) from km 1st of Tridwan road to Khoinal Package No. JK07-4018, PMGSY-IV, Batch-I of 2026-27, Block-Keerian Gandyal, District Kathua(Using Waste Plastics, Length 2.500 Kms)
Permanent Restoration of road T01-Tikibagh, Package No JK13-120.