| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L Quoted ₹3.9 L | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance Higher Bid |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
16 Jul 2026, 6:55 pmClosed
Executive Engineer PMGSY Divison Ganderbal
ganderbal
Permanent Restoration of road Dub Khanpora, Package No JK13-80.
2026_KSRRD_148633_3
E-NIT No. 04/EE/PMGSY/Gbl/E-tendering of 2026-27, Dated 09/07/2026
Open Tender
Civil Works - Roads
Percentage
30 days
Ganderbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹300
₹16,000
27 Aug 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 36.74 | cum | 225.21 | ₹8,274.22 |
| 2 | Type B Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including all carriages | 4.76 | cum | 1,133 | ₹5,397.61 |
| 3 | (CEMENT CONCRETE CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages of material involved | 4.76 | cum | 4,934 | ₹23,505.58 |
| 4 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. 300 mm Dia including all carriages of material involved | 14.64 | RM | 3,173.19 | ₹46,455.5 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved | 7.98 | cum | 6,151 | ₹49,084.98 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages of material involved | 53.28 | cum | 7,756 | ₹4,13,239.68 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 137.5 | Sqm | 551.46 | ₹75,825.75 |
| 8 | Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 granular material including all carriages. | 32.73 | CuM | 1,241 | ₹40,611.73 |
| 9 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 | 70 | No | 221.83 | ₹15,528.1 |
| 10 | Total Construction cost without GST | 1 | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.86 MB
BOQ_233369.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].