Loading…
Loading…
515 results • Latest
Preparation of Detail Project Report (DPR) for Chhatni Kumirpara Road with a link to Dogachia Health Centre from Ch. 0.00 Km. to Ch. 17.7 Km.-Strengthening work.
Preparation of Detail Project Report (DPR) for Burdwan-Katwa Road to Burdwan-Suri Road via Palitpur from Ch. 0.00 Km. to Ch. 5.15 Km.- Widening and Strengthening work.
Repair and Replacement of damaged roof shed and other allied works inside Seharabazar Section Office, under Burdwan East Sub Division (PWD) under Burdwan Division PWD .
Repair of Boundary Wall and outside of Office building at Memari Stack Yard cum P.W.D. Section Office with painting under Burdwan Division, PWD in the district of Purba Bardhaman.
Change of Occopation at Bicharak Neer, 2nd floor R/S quarter for use of Learned District Judge at Sadhanpur,under Burdwan East Sub-Division.
Repair and Maintenance of Road flank on Durgadas Road from Ch. 4.00 Kmp to Ch. 8.00 Kmp under Burdwan East Sub Division (P.W.D) under Burdwan Division
Speed calming measures at vulnerable locations on various roads of Purba Bardhaman district by Public Works Department Project ID TR232416892S000 3rd Call
Drain cleaning, Dismantling of drain slab and Reconstruction of slab over PCC main Drain beside left side of G.T. Road from Sun Hospital to Golapbag more under Burdwan Division, PWD.
Repairing of Barakar Inspection Bungalow and cleaning the compound area of the Bungalow under Asansol Division PWD during the year 2026-2027
Emergent rain damaged repairing of different road under section-1, PWD under Burdwan Sub Division under Burdwan Division, PWD