Loading…
Loading…
363 results • Recent activity
AMC of Clearing and removing of drainage congestion from Waterways Slope for total length of 7.70 Km (3.00 Km of Nakole Khal, 2.20 Km of Branch of Mohanpur Khal and 2.50 Km of Rana Khal) at G.P- Nakole and Bachhri Block-Shyampur-II , P.S-Shyampur.
AMC of Clearing and removing of drainage congestion from Waterways Slope for total length of 17.05 Km (4.50 km of Chilara Palgaria Khal, 4.05 Km of Chanpabar Pipulan Khal,5.80 Km of Lahiripara Khal and 2.70 Km of Kulatapara Khal) at G.PBachhr etc.
AMC of Clearing and removing of drainage congestion from Waterways and Slope drainage channel from Satamukhi sluice to Banstala for a length of 1.02 KM in Uluberia Municipality, Block- Uluberia-I, P.S- Uluberia, Dist- Howrah.
AMC of Clearing and removing of drainage congestion from Waterways Slope for total length of 7.00 Km ( Branch of MMC Khal 3.50 Km from Kanchari Pol Mallick Para to Uluberia Industrial Growth area and 3.50 KM from Duttapara to Gharsalav )
AMC of Clearing and removing of draninage congestion from Waterways Slope for total length of 8.70 Km ( 2.50 Km of Chapa Khal and its branche from Birepur More to Kantakhali, 2.70 Km from Birepur More to Damodarpur and 3.50 Km from Mannat Chac
A.M.C of clearing and removing of drainage congestion for waterways and slopes of Banspati Khal-1.50km, Barberia Khal-1.50 km,Boalia Main Khal-4.00 km,Bolar Khal-2.00 km,Dewantala Khal-1.50km,Godaipur khal-4.00 km,Kansona Khal-3.00 km,Kashmul Khal et