Loading…
Loading…
522 results • Latest
M/R to Embankment restoration work of Damodar L/B for length 60.00 mtr. Near Sarda Two vent Sluice, Bankura Sluice and Shitalchalk Sluice G.P-Kushberia, Block-Amta-II,Dist -Howrah.
M/R to Protection work leftbank of Damodar river for a length of 60.00 mtr at Koria Moynapur pump house in Mouza-Koria Moynapur, G.P.-Hatgacha-I, Block-Uluberia-I, Dist-Howrah
M/R to Repairing work of 2 nos wooden bridge over Tiyar khali khal and Nalpur state khal ,G.P.-hallyan, Block-Bagnan-II, Dist.-Howrah.
Replacement of Damaged Town Mission School wooden bridge over Medinipur Main Canal at Bera Para in Uluberai I Block P.S- Uluberia, Dist-Howrah under Rajapur Section of Seijberia Irrigation Sub-Division.
Construction of New Wooden Bridge (Length - 30.60 Metre) at Jagarampur Ring Bandh Play Ground over Jagarampur khal in G.P- Joargori, P.S- Rajapur, Block - Uluberia-II, Dist.-Howrah under LDC Sub-Division No.II.
M/R to Protection work along the Right bank of Chandanapara Khal at Chandanapara for a length of 50 m in G.P.- Mugbenapur, Block- Bagnan- II, P.S.- Bagnan, Dist.- Howrah under Seijberia Irrigation Sub- Divn of Lower Damodar Construction Division.
M/R to Kultapara wooden bridge(Length 35.00m) in place of damage wooden bridge over Medinipur Main Canal Reach-VII in G.P.-Chandrabhag, Block - Bagnan-II, P.S - Bagnan,District - Howrah.
M/R to Baikunthapur wooden bridge(Length 24.00m) in place of damage wooden bridge over Nakole khal at Baikunthapur G.P.-Nakole , Block - Shyampur-II, P.S - Shyampur,District - Howrah.
M/R to Mahabir wooden bridge(Length 42.00m) in place of damage wooden bridge over Medinipur Main Canal Reach-VII at Khanjadapur in G.P.-Bantulbaidyanathpur, Block - Bagnan-II, P.S - Bagnan,District - Howrah.
M/R to Protection work along the right bank of CHETUA Khal at Rabibhag for a length of 50 m in G.P.- Chandrabhag, Block- Bagnan- II, P.S.- Bagnan, Dist.- Howrah under Seijberia Irrigation Sub- Divn of Lower Damodar Construction Division.