Loading…
Loading…
522 results • Latest
M/R to Protection work along the Left bank of Chandanapara Khal at Pataldanga for a length of 85 m in G.P.- Mugbenapur, Block- Bagnan- II, P.S.- Bagnan, Dist.- Howrah under Seijberia Irrigation Sub- Divn of Lower Damodar Construction Division.
Repairing of 03 (Three) nos wooden Bridge near Paschim Kashmul Primary School, near Haru Das house, near Jibon Adak house over Branch of Chapa Khal in Block- Uluberia-I, Dist- Howrah.
M/R to Protection of river embankment for a length of 60.00 m at Atteswari on the left bank of Rupnarayan in G.P -Baneswarpur-II, Block -Shyampur-I, District-Howrah
M/R to protection along left bank of Pansrapara Gurepole khal for a length of 30.0 near pansrapara Hindu Samaboy Bank in GP-Baneswarpur-I, Block-Shyampur-I, District-Howrah.
Reconstruction of Wooden Bridge (Length-32.80 Metre) over Purana Khal at Debandy in G.P. Shyampur, P.S- J.B.Pur, Block - J.B.Pur, Dist.-Howrah under LDC Sub-Division No. - II.
Annual Maintenance and Up-keeping of office building (Four nos Floor) and office complex of Lower Damodar Construction Division for 1 (one) year at Fuleswar Uluberia, Dist-Howrah.
M/R to Irrigation Bundh Gurudham Harinarayanpur for a length of 100.00 Mtr. at MugKailyan G.P,under Bagnan-II Block, P.S-Bagnan, District-Howrah.
Protection work at left side of Bhawanipur Sluice structure and at confluence point of Bhawanipur Khal and Old Damodar for the length of 65.00 metre at G.P-Balichaturi, Block-Shyampur-I,P.S-Shyampur, Dist-Howrah.
Protection work along left bank of Chandanapara Khal for a length of 48.00 M at Daluipara in gG.P-Hallyan, Block-Bagnan-II, P.S-Bagnan, Dist-Howrah under Seijberia(I) Sub-Division.
Restoration of slipes, erosions along the countryside of river Rupnarayan left bank over right side of existing drainage channel parallel to the Rupnarayan left at Shibpur near Shibpur wooden bridge for a length of 30.00m in G.P-Baneswarpur-II,